Awesome Image
  • Home
  • About Us
  • What We Do
    • FUEL BASED CAPTIVE POWER
      • Diesel
        • Cummins Engine Business Unit (EBU)
        • Cummins Power Generation (CPG)
        • Cummins Generator Technologies (CGT)
      • HFO
        • Hyundai
    • Machinery
      • Machines & Cranes
      • Forklift Trucks - Hangcha
      • Road Maintenance Trucks
    • Fire & Security
      • Security – Miscellaneous
      • Fire – Miscellaneous
    • Transmission and Distribution
      • EPC Transmission & Distribution
    • Gas Gensets
      • INNIO Jenbacher
      • INNIO Waukesha
    • RENEWABLE BASED CAPTIVE POWER
      • Wind
        • Renewable Energy
      • Solar
        • EPC Solar Solution
        • Grid Tied Solar
    • Lube Oil
      • Valvoline Gas Engine Oil
      • Valvoline Diesel Engine Oil
    • HVACR
      • Absorption Chillers – Shuangliang
      • Electric Chillers and AHUs – DB
      • Cooling towers – Mesan
  • Solutions
    • Engineering
    • Services
    • Parts
  • Projects
  • Media
    • News & Events
    • Training & Seminars
    • Newsletter
    • Video

Global Certifications

Awards & Achievements

News & Events

OES Supports IEEEP Karachi Center Symposium as Silver Sponsor

2-May-2025

OES Supports IEEEP Karachi Center Symposium as Silver Sponsor:

Recognizing the significance of this prestigious gathering, we proudly participated as a Silver Sponsor of the annual symposium organized by the Institute of Electrical and Electronics Engineers of Pakistan (IEEEP).

At OES, we deeply value platforms that foster innovation, drive collaboration, and accelerate technological progress. The event served as a vital forum for knowledge exchange, networking, and the presentation of emerging technologies shaping the future of engineering and industry.

We presented our expertise on Smart Microgrids & BESS: Building Blocks of the Autonomous Grid, followed by an engaging Q&A session. Attendees were given the opportunity to interact directly with OES experts and gain first-hand insights into our innovative energy solutions.

7 MW Solar Park Project Signed with Servis Long March Tires

25-Apr-2025

We are pleased to announce the successful signing of a 7 MW Solar Park Project at Servis Long March (SLM) Tires, a leading all steel radial truck & bus tire manufacturer and exporter in Pakistan.

This landmark agreement represents a significant step forward in our shared commitment to sustainable industrial growth and the transition to clean energy. The project will enable Service Industries Limited to significantly reduce its carbon footprint, lower energy costs, and enhance export potential through the integration of renewable power.

This repeat 7 MW project, following our successful 2 MW installation at SLM, underscores our commitment to quality, client satisfaction, and our capability to deliver reliable solutions while fostering lasting client relationships.

Key Features of the Solar Project:

• Annual Energy Output: ~10.5 million kWh

• CO₂ Emissions Reduction: ~7,350 tons annually — supporting a cleaner environment and climate action

OES & FGI (Windsun) Enhancing Power Quality with SVG/STATCOM.

21-Mar-2025

Driven by our mission to support industries overcome power challenges more efficiently, OES has partnered with FGI WINDSUN SCIENCE & TECHNOLOGY CO., LTD. to introduce Static Var Generator (SVG/STATCOM) technology in Pakistan.

Successfully deployed across multiple sectors all over Pakistan, this cutting-edge solution enhances power quality, improve power factor, stabilizes voltage and improves energy efficiency. Our expert team has worked closely with leading textile industries, developing and delivering tailored solutions with the assurance of seamless integration through hands-on installation and commissioning.

With our expert engineers now trained for installation and commissioning, we are ready to deliver seamless integration and unmatched support for businesses looking to optimize their power systems.

Ensuring Reliable & Efficient Power Transmission at Wind O&M Sites.

27-Feb-2025

Regular preventive maintenance is essential for ensuring the reliability, efficiency, and longevity of power transmission networks at Wind O&M sites. With its expertise in managing 250MW Wind Farms, OES plays a vital role in minimizing downtime, optimizing system performance, and supporting a greener energy future in Pakistan.

Our expert team conducted comprehensive maintenance at 132kV grid stations, including:

• Planning & scheduling to reduce downtime

• Inspection & cleaning of key components

• Functional testing of transformers & circuit breakers

• Protection relay checks & earthing system verification

A New Era of Gensets – Exclusive Launch Highlights.

14-Feb-2025

At OES, innovation is at the heart of everything we do. Keeping market needs in focus, we are proud to introduce our new range of Cummins gensets, specifically designed for Pakistan’s market.

To mark this milestone, we hosted a launch ceremony in collaboration with Cummins, where customers from the South region experienced an exclusive presentation by the OES and Cummins teams. The event also featured a live product showcase, highlighting the key features our customers value in diesel gensets. Stay tuned for more insights and glimpses from this exciting launch

OES Partners with Rupali Group to Deliver Advanced 900 USRT Steam Chiller Solutions.

17-Jan-2025

At OES, we provide expert consultation and tailored energy solutions to meet our clients’ needs, helping businesses achieve efficiency and sustainability.

Recently, we partnered with Rupali Polyester Limited , a leader in polyester production and energy management, to supply a 900 USRT steam chiller unit, recognizing the advantages of High C.O.P Steam Operated Absorption Chiller technology. These units utilize steam to deliver energy-efficient, large-scale cooling while reducing electricity costs and promoting sustainability.

Building on this success, we are now supplying five additional steam-based absorption chillers. With many units operational for over 10 years, this partnership underscores our commitment to delivering reliable, long-lasting solutions for industrial applications.

OES Partners with Gadoon Textile Mills for a 2.9 MW Solar Project.

10-Jan-2025

We have proudly achieved yet another milestone in revolutionising sustainability in Pakistan by partnering with GADOON TEXTILE MILLS LIMITED for a 2.9 MW solar project.

Project Highlights:

• Capacity: 2.9 MW

• Annual Energy Production: ~4,500,000 kWh

• CO2 Emissions Reduction: ~3,500 tons/year

Our team is prepared to deliver a state-of-the-art solar system designed to meet the unique dome-shell structure of GTML, ensuring optimal energy performance and efficiency. This initiative reflects our commitment to driving industrial sustainability in Pakistan by reducing reliance on fossil fuels, lowering energy costs, and significantly cutting carbon emissions.

Orient Energy Systems Partners with Union Fabrics for Wind Turbine Installation

3-Jan-2025

This milestone reflects our position as a leader in renewable energy solutions, leveraging decades of expertise to empower businesses in their journey toward sustainability. The 6.5 MW wind energy project, enhanced by 5 MW of solar panels, a state-of-the-art battery storage system exemplifies a comprehensive and integrated strategy for harnessing clean, renewable energy. We have also ensured maximum energy efficiency with the deployment of our cutting-edge Microgrid System.

Our proven track record in designing, supplying, and implementing cutting-edge energy systems ensures that this project will not only bolster Union Fabrics Pvt. Ltd sustainability goals but also contribute to a cleaner and greener future for the community and the planet. Together, we are shaping a sustainable tomorrow.

Empowering Excellence: Advancing Technical Training with Coca-Cola Export Pakistan

20-Dec-2024

At OES, we harness the transformative power of technical training to empower teams, drive innovation, and achieve unmatched operational excellence. Recently, our North team successfully completed Operation & Maintenance Training, which included hands-on PCC 3.3 training and component identification of the KTA 38 generator set (Cummins Inc.) at Coca-Cola Export Pakistan's plant near Raiwind city.

This collaboration underscores the critical role of technical training in ensuring effective resource management and reaching proficiency and performance goals, further reinforcing our commitment to delivering high-quality technical expertise.

Announcing the 17.3 MW Rooftop Solar Project Partnership with GTML

13-Dec-2024

We are honoured to announce the successful signing of a contract for 17.3 MW rooftop solar project with Gul Ahmed Textile Mills Limited (GTML). This project represents one of the largest rooftop solar installations in Pakistan. Utilizing the latest HJT (Heterojunction) technology, it ensures enhanced yield, greater efficiency, and reduced annual degradation. This is reinforcing GTML’s commitment to sustainable energy solutions.

This project is a significant milestone in our journey toward delivering efficient and sustainable energy solutions. With a capacity of 17.3 MW, it will substantially lower GTML’s carbon footprint, exemplifying their dedication to environmental stewardship and corporate responsibility.

By embracing solar energy, GTML is not only reducing energy costs but also making a vital contribution to a cleaner, greener planet.

Ensuring Maximum Efficiency: Timely Overhaul of Waukesha Engines at PPL

29-Nov-2024

To ensure maximum efficiency and optimal performance of engines, OES has successfully completed the overhaul of two Waukesha Gas Engines at Pakistan Petroleum Limited Adhi Field in Gujjar Khan.

This critical project, vital for maintaining the natural gas supply, had to be completed within a demanding 72-hour (3-day) deadline set by the customer. Although OES routinely performs overhauls of Waukesha engines, this task was uniquely challenging as it required back-to-back top overhauls (TOH) of two engines, necessitating exceptional time management and technical expertise.

Despite these constraints, OES successfully delivered the project on time, restoring the engines to full operation and ensuring uninterrupted gas supply. This achievement highlights our unwavering commitment to high-quality service, even under pressure and completion of time-sensitive projects with precision.

Successful Completion of Water Softening Plant for Lucky Knits

22-Nov-2024

Water softening plays a critical role in industries by reducing scaling, preventing corrosion, extending equipment life, and improving operational efficiency.

At OES, we specialise in delivering customised, high-quality water treatment solutions tailored to industrial applications. OES has recently completed a successful water softening plant project for Lucky Knits Private Limited.

The project involved the design, supply, installation, testing, and commissioning of a 16m³/hr x 2 capacity plant, achieving a remarkable reduction in water hardness from 500ppm to 0ppm. Delivered on schedule, the system has been running smoothly, consistently meeting all operational requirements.

OES Partners with Imtiaz Super Market for Reliable Power Solutions

15-Nov-2024

Boosting Reliability: Preventive Maintenance at Lucky Renewables 50MW Wind Farm

8-Nov-2024

OES brings its expertise to Lucky Renewables (50MW Wind Farm), delivering comprehensive preventive maintenance for the 132kV grid station. Our team carried out inspections, testing, and servicing of critical components, including power transformers, circuit breakers, isolators, protection relays, and auxiliary systems. Key steps included:

. Planning and scheduling to minimize downtime

. Thorough inspection and cleaning of transformers

. Circuit breaker functionality testing and component replacement

. Protection relay accuracy checks and earthing system assessments

This annual maintenance enhances system reliability, reduces downtime, and extends equipment life across the power transmission network, supporting consistent and efficient energy delivery.

OES and Shuangliang Set a New Standard in Sustainable Cooling Solutions for Sapphire Textile Mills

1-Nov-2024

OES, in partnership with Shuangliang Group , proudly reaffirms our market leadership with the successful installation of a 400 RT Shuangliang Hot Water Absorption Chiller at Sapphire Textile Mills - Kotri. Integrated with two gas generators, this cutting-edge chiller showcases our commitment to delivering premium, fully integrated HVACR solutions.

Sapphire Textile Mills commitment to responsible innovation aligns seamlessly with our long-term vision for sustainable, high-efficiency energy solutions. This installation marks a key reference project for both OES and Shuangliang in the textile sector, embodying our shared dedication to environmentally responsible and high-performance systems.

Successful Engine Overhaul Completed for OGDCL Kunnar

27-Sep-2024

OES, with its industry-leading expertise in engine overhauls, specializes in delivering high-performance solutions with a focus on reliability and precision. We understand the importance of ensuring engines operate at their peak, which is why we provide comprehensive analysis and tailored services to meet our clients' needs.

We are proud to announce the successful completion of an F-3524 GSI engine overhaul for our valued client, OGDCL Kunnar, at our state-of-the-art workshop. Our experienced team meticulously restored the engine, enhancing its performance and efficiency. Using advanced tools and techniques, we completed the project ahead of schedule, reinforcing our commitment to quality service and customer satisfaction.

Strengthening Collaboration: IDAP Team Visits OES Lahore Facility

30-Aug-2024

OES recently welcomed a team from the Infrastructure Development Authority of Punjab (IDAP) to our Lahore office and workshop. As a key client in the Cummins Diesel Gensets sector, IDAP plays a crucial role in executing major infrastructure projects across Punjab with efficiency, transparency, and quality.

During their visit, the IDAP team had the opportunity to observe our operations closely, gaining insights into our commitment to quality and excellence in serving the needs of Punjab Government Hospitals, commercial buildings, and other critical infrastructure. The visit also facilitated valuable discussions on how our expertise aligns with IDAP's objectives, particularly in energy infrastructure, public health, and housing sectors. The visit further strengthens the collaboration between OES and IDAP, ensuring that we continue to support their mission of delivering high-quality infrastructure projects across Punjab.

Celebrating 3 Million Safe Man-Hours: A Milestone in Safety Excellence

26-Aug-2024

OES is proud to announce that our O&M Wind sites have achieved a significant milestone of over 3 million safe man-hours without a Lost Time Injury (LTI). This achievement underscores our steadfast dedication to safety, which is integral to every aspect of our work, We continuously invest in rigorous training, safety protocols, and a culture of vigilance to ensure the well-being of our team and the communities we serve.

OES Unveils Pakistan’s First Industrial-Scale Super Capacitor Energy Storage Solution

9-Aug-2024

The future of energy storage is here! The need to elevate from traditional batteries to cutting-edge super capacitors has never been more urgent. OES is proud to lead this transformation by introducing the revolutionary ENCAP (Encapsulated Hybrid Graphene Solid State Capacitor) for the first time in Pakistan.

OES is thrilled to announce the signing of Pakistan’s first industrial-scale "Super Capacitor" based Energy Storage solution with Yunus Textile Mills Partnering with ENERCAP Holdings LLC from Dubai, we are unveiling a groundbreaking storage technology that offers a superior alternative to traditional batteries, free from chemical and acid elements. This innovative solution will be installed at Yunus Textile Mills in Nooriabad, alongside 2 wind turbines (9.6 MW), a complete microgrid, and a Reactive Power Compensation System provided by OES. This initiative represents a complete, all-encompassing energy solution under one umbrella, epitomizing OES's commitment to service excellence and innovation.

Pharmagen Limited and SAMI Pharmaceuticals Join Forces for Solar Solutions

26-July-2024

ZPL Achieves One Million Safe Man-Hours Without LTI

19-July-2024

At OES, we place a high value on Quality, Health, Safety, and Environment to ensure the well-being of our team and the success of our projects. This commitment to QHSE standards has been instrumental in achieving a remarkable milestone: one million safe man-hours without a Lost Time Incident (LTI) at our wind project. This achievement underscores our dedication to maintaining a safe and productive workplace.

Lucky Cement Hybrid Project: A New Chapter in Renewable Energy

5-July-2024

We are excited to unveil the successful erection of the first of six turbines in the nation's largest hybrid project at Lucky Cement Limited Karachi.

This Goldwind turbine, boasting an impressive hub height of 110 meters, is the largest wind turbine ever installed in the country's history. It was erected by OES Wind Team using its own crane.

This landmark achievement not only sets new records but also marks the inaugural execution of a renewable hybrid project of this scale by a local organization. This milestone underscores Orient's commitment to pioneering advancements and contributing to a greener future.

Take a sneak peek at the project by clicking the link below:

Click Here

Successful Completion of ESM2 Upgrades for United Energy Pakistan

14-June-2024

Working with organizations and individuals whose goals align with OES is always a privilege. These partners, like United Energy Pakistan, understand the equipment life cycle, strive to improve engine efficiency, and are committed to achieving desired results. OES has been entrusted with the crucial tasks of overhauling, troubleshooting and upgrades to ensure optimal performance.

Recently, OES successfully completed the ESM2 upgrades of L7044GSI Engines at five different locations in Sawan and Kadanwari. Our scope included the supply, installation, testing, and commissioning of the complete system.

We managed to complete the project within the stipulated time frame without any failures. This achievement underscores our commitment to excellence and innovation in Waukesha product upgrades.

OES Empowers Pakistan with Cutting-Edge Wind Energy Solution.

27-May-2024

Sailing on May 24th, the shipment of 38.4 MW of advanced wind turbines (8 turbines, each 4.8 MW) marks a significant milestone in Pakistan's renewable energy landscape.

These will be the tallest in Pakistan once installed, demonstrating our commitment to innovation and sustainability. OES is responsible for the complete installation of these turbines, ensuring they are seamlessly integrated into the client's existing network.

Beyond installation, OES provides comprehensive design services, including the development of a sophisticated Microgrid. This cutting-edge system will manage all available generation sources, guaranteeing a stable and cost-effective power supply to the customer.

By spearheading this project, OES is not only contributing to renewable energy goals worldwide but also demonstrating its leadership in delivering high-quality, reliable and efficient energy solutions. Once in operation, it will reduce CO2 emissions by up to 63,000 tons /year.

OES Partners with Maqbool Textile Mills for 5.8 MW Solar System Installation.

17-May-2024

At OES, we are driven by a vision of excellence and powered by engineering innovation. The partnership with Maqbool Textile Mills Limited highlights our dedication to quality, efficiency and customer satisfaction.

We are excited to announce a major achievement in our journey towards sustainable energy solutions, OES has signed a contract to install and commission a 5.8 MW Solar System. This on-grid system ensures a seamless energy flow and promises significant cost savings and returns for the business.

This project is a significant step in our commitment to innovative and sustainable energy solutions. With the strong support of the key management of Maqbool Group, we are confident in our ability to deliver efficient energy solutions that meet and exceed expectation.

Adam Milk Foods Enhances Operations with Cummins Diesel Generator Acquisition.

26 Apr 2024

Completion of Longblock Upgradation for QTY-2 Gas Generators.

19 Apr 2024

We are delighted to announce the successful completion of Longblock Upgradation for QTY-2 Gas generators! This achievement Indicates a major milestone for us and represents a significant step forward in our dedication to excellence and sustainability.

The upgradation has yielded several benefits:

- Increased capacity by approximately 30%.

- Enhanced reliability, ensuring seamless operations.

- Improved gas consumption efficiency, contributing to cost savings and sustainability objectives.

- Reduced reliance on external power sources leads to decreased dependency and operational risks, resulting in a positive financial impact.

These enhancements are in perfect alignment with client's strategic objectives, demonstrating our commitment to reducing environmental impact while optimising operations.The expertise, teamwork and unwavering commitment of OES and client teams have played a pivotal role in achieving this project's success. Together, we have showcased our ability to innovate, adapt and achieve remarkable results.

OES and Goldwind Announce Landmark Agreement to Drive Sustainable Energy Expansion in Pakistan.

15 Mar 2024

OES and Goldwind have joined forces in a commitment to assist Pakistan's industries in adopting green practices and achieving Net Zero goals.

We are delighted to announce that OES and GW have signed framework agreement to supply 150 MW of wind turbines for the Pakistan’s Industrial Captive market, marking a significant milestone in our commitment to sustainable energy solutions.

Out of this 150 MW, 50 MW + is already in production in Goldwind factories and site construction has started. OES is offering complete one window solution which includes wind resource assessment, feasibility study, detailed engineering, supply of wind turbine from Goldwind, civil constructional works, wind turbine installation, testing and commissioning under Goldwind supervision along with electrical & control integration with existing system through a state of the art Micro Grid system to have different generation sources work together, provide smooth operation of the plant and optimization to get lower LCOE.

GOLDWIND is world’s largest wind turbine manufacturer in the world with a globalpopulation of 115 GW+ with a market leadership position in Pakistan with 538 MW in IPP and Captive Market. OES as local company has the biggest portfolio of renewable energy (Solar+ Wind), having inhouse capability of complete design, engineering, project management, construction, testing and commissioning, backed by OES trade mark after sales services!

Shuangliang Milestones with OES and Ismail Industries

2 Feb 2024

For a decade, OES has proudly partnered with Ismail Industries Limited, becoming Shuangliang Group's foremost client for Absorption chillers in Pakistan. In this enduring collaboration, Ismail Industries trusted OES for 16 successful Absorption chiller installations, including innovative types like Direct Fired and Esterified Steam Fired

A key milestone is the installation of the first Shuangliang Esterified Steam Fired Absorption chiller at Ismail Resin factory, boasting a 500 RT cooling capacity. With a total capacity of 5118 RT, Ismail Industries leads the industry, emphasising their commitment to cutting-edge cooling solutions. This lasting bond not only highlights trust in OES capabilities but also signifies a thriving partnership that leaves a mark across industrial hubs in Pakistan.

Long Block Replacement Achievement - OES and INNIO Jenbacher Partnership in Pakistan

26 Jan 2024

Embarking on a journey together, the powerful partnership between OES and INNIO Jenbacher has reached new heights of achievement.

The recent accomplishment of our dedicated team in achieving the first-ever long block replacement activity for Type 4 (JGS420) in Pakistan's southern region marks a significant milestone in our collaborative journey. Gas genset block replacement brings improved reliability, efficiency, extended lifespan and cost effectiveness.

This accomplishment not only reinforces our combined reputation but also establishes a benchmark for forthcoming collaborations, positioning INNIO as one of the most diverse gas genset options in Pakistan. Coupled with the exceptional expertise of our trained OES service team, we offer comprehensive services, encompassing not only sales but also post-sales support and parts services for Jenbacher engines.

15-Years Journey of Innovation and Success with Hangcha

12 Jan 2024

Powering Mall of Gulberg with Cummins Support

15 Dec 2023

We are delighted to announce our role as the power supply provider, ensuring uninterrupted electricity and serving as the power generation backup for the esteemed Mall of Gulberg project in Islamabad—a dynamic mixed-use commercial and residential venture. The project showcases a robust design with a total prime rating of 5650kVA, featuring 3 x 1500 kVA and 2 x 575 kVA gensets. Our sincere appreciation goes to the unwavering support from key contributors, and a special shoutout to our dedicated teams for their meticulous site study and outstanding collaboration with customers and consultants.

Cummins consistently provided invaluable support, contributing significantly throughout the entire deal.

Pioneering Fire Safety Initiatives: OES and Trango Tek's Collaborative Success Story

8 Dec 2023

Amidst the rising fire and safety incidents in Pakistan, OES is at the forefront, recognising the critical need for innovative fire safety solutions. Trango Tek Pvt Ltd stands out by adopting cutting-edge fire and safety measures. This proactive approach not only elevates employee safety but positions of both Trango Tek and OES as best-practice employers dedicated to fostering a secure and resilient workplace.

OES has provided a comprehensive Fire Safety solution to Trango Tek Pvt Limited, including NFPA 20 standard EDJ Fire pumps and top-notch fire equipment. The system is installed in strict compliance with National Fire Protection Agency standards, ensuring utmost customer satisfaction.

The synergy between SFFECO's quality products and OES reliable services has broadened our horizons, reaffirming our commitment to delivering top-notch safety solutions.

Partnership Triumph with SABSON Energy - MAN HFO Engines at Yemen Cement Plant

1 Dec 2023

Excited to share the success of our partnership with SABSON Energy! We have secured a substantial project, overseeing the installation of MAN HFO engines at an advanced cement plant in Yemen. Our extensive scope encompasses LT/HT Radiators, detailed civil engineering design, Black start diesel generator, erection and installation works, control system architecture, and complete piping. This comprehensive approach ensures the smooth and successful delivery of the project.

This partnership highlights our resolute dedication to excellence in power solutions, further reinforcing OES as a reliable partner. We are dedicated to contributing to the growth and success of our esteemed partners. As OES continues to thrive, delivering innovative energy solutions, we proudly contribute to the progress of the MENA region.

Successful Cummins Power Generation Event: Highlights and Industry Collaboration

17 Nov 2023

OES recently hosted a noteworthy get-together for Cummins Power Generation in Faisalabad, held at Serena Hotel on November 7, 2023. The event commenced with a comprehensive introduction by team members, providing insights into OES scope of work. Subsequent presentations highlighted the achievements and success stories of the years 2021-23, and a technical Q&A session, led by a company representative, delved into the 24/7 service support and workshop facilities offered by OES.

Seminars such as these play a pivotal role in fostering industry collaboration, as demonstrated by the active participation of more than 25 customers and their teams. These gatherings not only serve as forums for sharing insights and achievements but also strengthen relationships within the business community, contributing to the overall growth and success of the industry.

Lucky Cement Ltd Extends Order for 6.3MWp Solar System at Nooriabad.

10 Nov 2023

It brings us great joy to announce that Lucky Cement Limited has extended an order for a 6.3MWp solar system at Nooriabad. This decision is a direct result of the outstanding performance and service delivered by our dedicated team, particularly showcased in the early completion of the 25MW solar project.

Lucky Cement's confidence in OES underscores our commitment to providing sustainable and innovative energy solutions. This continued partnership signifies a shared dedication to renewable energy and highlights OES's proven track record in delivering high-quality timely and cost-effective solutions within the dynamic energy landscape.

MOC signing between OES and The Hunar Foundation

3 Nov 2023

OES acknowledges that a highly educated and skilled workforce is the driving force behind industrial expansion and comprehensive societal development. We view community work, education and training as investments in the future of Pakistan and its industries.

We're delighted to announce the successful signing of the Memorandum of Collaboration (MOC) between OES and The Hunar Foundation (THF). The ceremony, held on November 01, 2023, was a momentous occasion that marked the beginning of a promising partnership in providing training and educational opportunities to the students of The Hunar Foundation, empowering the next generation.

OES is committed to making a positive impact by engaging in community initiatives and providing quality education and training, laying the foundation for a prosperous and thriving Pakistan.

Successful Collaboration and Power Enhancements at Attock Petroleum Limited

27 Oct 2023

The collaboration between OES team and the robust technology of Cummins Inc. Gensets represents the perfect fusion of capabilities and service excellence. With a focus on delivering the optimal industrial solution, Attock Petroleum Limited has strengthened its operations by successfully installing a 100KVA Diesel Generator in Islamabad and 40KVA Gensets (06 Nos.) along Faisalabad - Multan motorway.

APL Operations and Maintenance department's endorsement of OES for their exceptional customer support services reflects a remarkable development. It underscores Attock Petroleum Limited's commitment to delivering top-notch services and ensuring reliable power solutions for its retail outlets.

The Diesel Generator sets were delivered within the committed lead time of 14 days, underscoring the efficiency and unwavering commitment of the involved teams.

Successful Installation of 1000 USRT VFD-Driven Dunham-Bush Centrifugal Chiller at Ocean Mall

20 Oct 2023

OES Achieves HVAC Milestone with Largest Centrifugal Chiller Supply. In a groundbreaking achievement, OES has set a new industry standard with the largest Centrifugal Chiller Supply, reaffirming its position as an HVAC leader.

Nestled within The Ocean Mall, a soaring 120-meter skyscraper in Karachi's Clifton district, OES has not only provided but expertly commissioned an impressive 1000 USRT VFD Driven Dunham-Bush Centrifugal Chiller – a remarkable feat.

Our Centrifugal Chillers are celebrated for their efficiency, reliability and precise cooling solutions, all while upholding an eco-friendly ethos. This accomplishment exhibits our dedication to excellence and our enduring partnership with Dunham Bush in Pakistan.

OES Secures Major Fire Safety Partnership with Sami Pharmaceuticals

27 Sep 2023

OES is renowned for offering SFFECO fire pump system, known for its reliability, efficiency and cutting-edge technology. This partnership enhances SAMI Pharmaceuticals (Pvt.) Ltd. safety and security, emphasising our shared commitment to innovation.

We recently achieved a significant milestone, securing an order for a 1500 gpm, 10 bar EDJ Fire Pump set from Sami Pharmaceuticals. Our focus on After Sales Service and Engineering support strengthens our position as a trusted fire safety solutions provider. Specialising in cutting-edge fire systems, emergency response equipment, and safety consultation, OES is dedicated to safeguarding lives, assets and industries.

Transforming Water Filtration: OES and JB INDUSTRIES Leading the Way

22 Sep 2023

Reverse osmosis, a pinnacle in water filtration tech, has become a cornerstone for industries in Pakistan. At OES, we're proud to share core values with JB INDUSTRIES – a dedication to unwavering quality and promoting Pakistani products worldwide.

Our mission with JB INDUSTRIES involved everything from system design to installation, testing, and commissioning. We tackled raw water with a TDS (Total Dissolved Solids) of up to 20,000ppm. Plus, we introduced an Energy Recovery Turbine (ERT) to cut energy costs by 20-25%. Our team's incredible efficiency shines through with an overall recovery rate of around 60%.

Our OES RO plants harness substantial water pressure, offering unparalleled water purification efficacy. These Industrial Reverse Osmosis Plants are custom-designed to meet specific water output needs, from everyday drinking to specialized applications like food processing, pharmaceuticals, and boiler feeds.

30K Maintenance Overhaul on 2 Gensets JMS-320 for Clean Energy Solution (Lebanon)

8 Sep 2023

The remarkable attention to detail, strict adherence to safety procedures and effective problem-solving abilities of OES team received commendation from Clean Energy Solution (Lebanon) a private IPP entity that utilizes 7 x JMS-320 INNIO JENBACHER Gensets for electricity generation.

Our team recently conducted a Minor Overhauling (30K) maintenance on 2 gensets JMS-320, following strict safety protocols with trained engineers. Prior to this, our Service team successfully commissioned 7 Genset JMS-320 units, which impressed Clean Energy Solution (Lebanon) and INNIO JENBACHER, leading them to seek our services once more for Minor Overhauling. This achievement marks a pivotal milestone for our operations, made possible by the dedication and professionalism of our team.

Procurement of 1400kVA unit by M/s Mindbridge

4 Sep 2023

We are thrilled to highlight our enduring partnership with Mindbridge, a premier call center in Pakistan with 6500 employees serving clients worldwide. Back in 2020, M/s MindBridge made the decision to select OES as their preferred product and service provider for the acquisition of 2x700kVA DG Sets. This choice came after intense competition, reflecting their strong faith in the quality and reliability of our services to energize their cutting-edge facility.

As their power demands grew, they turned to OES again in Feb 2023, adding a new 1400kVA unit to ensure uninterrupted operations. Our commitment to their success remain.

Ahead of Schedule and Exceeding Expectations - 25 MWp solar project at Lucky Cement Limited

28 Aug 2023

We are delighted to announce the successful completion of 25 MWp solar project at Lucky Cement Limited Karachi Plant well ahead of the targeted timeline.

This project had multitude of design and construction challenges. The design phase encompassed delivering a microgrid control system capable of integrating and controlling both existing and future generation sources, maintaining power factor etc. This system ensures a constant supply of cost-effective energy without compromising reliability. Remarkably, not only did our team surmount these challenges successfully ahead of time resulting in the conservation of approximately 3.5 gigawatt-hours (GWh) of energy.

The attainment of this remarkable feat was made possible through the unyielding commitment of OES Engineering team, amplified by the exceptional collaboration with our esteemed client.

What truly sets OES apart is its comprehensive in-house design capabilities, supported by licensed software, and a highly experienced construction team with robust quality assurance and quality control processes in place.

OES and PPL Shaping the Future of Energy in collaboration with Waukesha

18 Aug 2023

At OES, we hold the belief that our journey to success is closely connected to the success of our clients. Pakistan Petroleum Limited (PPL) a pioneering force in oil and gas exploration and their latest triumph, Hala Gas Processing Plant in Tando Alam, Sindh, illuminates innovation and collaboration within the industry.

At the core of this achievement rests an extraordinary partnership of INNIO Group Waukesha Gas Engines and OES. In the face of fierce competition, OES, armed with Waukesha gas engines, exemplified not only cutting-edge technology but also unwavering commitment to excellence.

The sense of accomplishment is evident in the partnership between OES and INNIO Waukesha. Their gas power solutions and unparalleled after-sales support were the cornerstones of PPL Hala Project's success.

This partnership showcases the path of a visionary energy sector, pointing towards a future brimming with innovation and sustainable progress. As OES and PPL forge ahead, their alliance serves as a beacon for a brighter, energy-efficient world.

Elevating Fire Protection Excellence with Imperium Hospitality

11 Aug 2023

We extend our sincere gratitude to Imperium Hospitality Limited for selecting us as their reliable ally in guaranteeing exceptional fire protection. OES proudly stands as the force behind Imperium's cutting-edge safety protocols, powered by a variety of SFFECO Fire Fighting equipment that have solidified Imperium's status as a class-leading establishment.

Our partnership with Imperium Hospitality is a prime example of the remarkable synergy that arises when shared goals align. Together, we've achieved milestones that set new industry standards, proving that collaboration can pave the way for unmatched success.

Since our collaboration, the market's enthusiastic response to SFFECO products has been nothing short of phenomenal! This partnership has not only elevated the acceptance of SFFECO's products but has also propelled OES to broaden its horizons. With the unwavering support and confidence of SFFECO, our team has been empowered to expand horizons and provide clients with the very best products, complemented by OES's impeccable and reliable services.

P-611 Spark Plug Field Validation & INNIO Jenbacher Recognition

4 Aug 2023

OES takes great pride in our dedication to customer satisfaction. As an exemplar of this commitment, we installed INNIO P611 spark plug in Lucky Energy T624 engine, as field validation test , garnering valuable feedback that truly exemplifies the spirit of innovation identical with INNIO Jenbacher.

Our strong alliance with INNIO has also opened doors for us on a global scale. INNIO recognised our potential and showcased our exemplary customer feedback during its e-training (Why buy a spark plug from Jenbacher? Commercial Training Program) worldwide.

Our commitment to inspiring and innovating together with INNIO will undoubtedly lead to more exciting developments and accomplishments in the industries.

HSE monitoring services to Gul Ahmed Energy Power Solutions (GAEPS)

27 July 2023

At OES, excellence isn't just a goal; it's ingrained in every service we provide! Recently OES managed to provide sterling .

HSE monitoring services to Gul Ahmed Energy Power Solutions (GAEPS) during the monumental FFC Wind Power Project in Jhampir, Sindh.

The responsibilities of OES HSE team during the lifting activity included:

· Conducting daily tool box talks (TBT) for all involved personnel.

· Carrying out daily inspections of tools and equipment to ensure proper certification and compliance with HSE standards.

· Monitoring and overseeing crane operations to ensure safety protocols were followed.

· Keeping a close watch on the workplace environment to identify and address potential hazards.

· Providing daily reports on activities related to Environmental, Occupational Health & Safety.

· Ensuring that all workers were equipped with appropriate Personal Protective Equipment (PPE) while at the workplace.

Join us on this journey towards a safer and more sustainable world!

OES and Cummins Arabia Collaborate to Avert Heavy Loss and Fines for LPG Serenity Gas Vessel

21 July 2023

For over two decades, OES has been steadfast in its dedication to providing exceptional services to clients worldwide. In a recent display of unwavering commitment, OES came to the rescue of LPG Serenity Gas Vessel, operated by Seaform Hamburg, when it urgently required emergency services for two out of its three 500KVA gen-sets powered by Cummins KTA-19 engines were non-operational.

In a remarkable display of efficiency and collaboration, Cummins Arabia and OES swiftly came to the aid of the LPG Serenity Gas Vessel during a critical situation. The vessel faced a race against time to reach the FOTCO oil terminal, with port compliance mandating at least two out of three DGs to be operational for berthing.

OES, in partnership with M International Marine services, mobilised their expert service team, arriving promptly early morning. OES team successfully restored the gen-set operations within few hours on the same day. This crucial intervention enabled the LPG Serenity Gas Vessel to navigate to Karachi harbour and berth on the FOTCO jetty within the stipulated timeframe, saving the customer from incurring heavy losses and fines.

Not only did OES team successfully restore the non-functional DGs, but they also delivered a comprehensive technical assessment to the Seaform Hamburg staff, offering valuable insights to prevent future mishaps and enhance overall equipment efficiency.

Acting swiftly and efficiently, OES ensured that the vessel received the necessary assistance, demonstrating once again why we are a go-to choice for reliable and prompt solutions in the industry.

25,000 running hours of 2 x 4MW (9H35DF) HYUNDAI HiMSEN TRIFUEL engines - Bangladesh

7 July 2023

Our reputation lies in providing exceptional solutions customised to fulfil your power plant requirements. We are thrilled to celebrate a major milestone achieved through our collaboration with Nasir Group of Industries in Bangladesh.

In 2019, we supplied, installed and commissioned 2 x 4MW (9H35DF) HYUNDAI HiMSEN TRIFUEL(HFO + Diesel + Natural Gas) engines along with BoP equipment. In 2023, both engines have successfully completed 25,000 running hours. This achievement serves as a testament to the unwavering commitment of Hyundai HiMSEN engines to long-term reliability and operational excellence with significantly lower running and maintenance costs.

Alongside the engine supply, we provided complete Balance of Plant (BOP) solutions, including:

1. HFO Purifiers: Purification of oil to remove sediments, sludges & water content.

2. HFO Boosters: Maintaining fuel pressure between 6-8 bar while ensuring viscosity and temperature requirements.

3. LO Purifiers: Enhancing the life of engine lube oil by removing impurities contained in lubricating oil.

4. Gas Compressor: Meeting the required inlet pressure of 6-7 barg.

5. Radiators: Efficient cooling of HT/LT water for the engine's optimal operation.

6. Starting Air Compressor: To provide required pressure during the engine’s initial startup.

7. Exhaust Gas Boiler: Recovering waste exhaust to generate steam, reducing costs associated with traditional steam production methods.

By offering end-to-end solutions, including installation and commissioning, OES ensured a seamless transition to reliable power generation.

28th HVACR International Expo and Conference

12 June 2023

We are elated to announce the tremendous success OES has achieved at the 28th HVACR International Expo and Conference! Our participation as an exhibitor allowed us to showcase our cutting-edge products and receive overwhelmingly positive feedback. This remarkable event served as a platform for OES to strengthen our brand presence and foster valuable collaborations, further solidifying our position as an industry leader.

As we celebrate this milestone, we must not rest on our laurels. Instead, let us channel our excitement and momentum to build upon this success and continue leading the way in the HVACR industry.

Electric/Diesel/Jockey UL/FM Fire Fighting pumping sets to Masood Textile Mills Ltd. / Beacon Impex (Pvt) Ltd

6 June 2023

The market acceptance of SFFECO products following its collaboration with OES continues to soar. SFFECO's unwavering cooperation and confidence in OES team has empowered us to broaden our horizons and provide our esteemed clientele with top-notch products backed by reliable OES services.

Masood Textile Mills Limited/Beacon Impex (Pvt) Ltd Faisalabad is a prominent leader in the manufacturing of knitted apparel products, ranging from basic essentials to highly fashionable garments. As an export-oriented manufacturer, they uphold a zero tolerance policy when it comes to quality standards. Their unwavering commitment to exceptional customer focus, delivery of high-quality products, and the ability to cater to customer needs through precise engineering solutions have been instrumental in fostering a strong and enduring business relationship with Masood Textile for OES.

Once again, Masood Textile has demonstrated their confidence and trust in OES by placing an order for two additional Electric/Diesel/Jockey UL/FM Fire Fighting pumping sets with accessories, each capable of delivering 1000 US gallons per minute at 10 bar. These orders are in addition to the identical set they previously ordered from OES in December 2022.

Signing of a 25 MWp solar project with Lucky Cement Limited

19 May 2023

We are pleased to announce the signing of a 25 MWp solar project with Lucky Cement Limited (PSX: LUCK).

This project will promote renewable and environmentally friendly energy sources for sustainable economic development. The solar plant shall be installed at their Karachi Cement plant. This will not only reduce the cost of generation at Lucky Cement and will also have a positive impact on the environment with a reduction of 23,800 tCO2 emissions per annum.

OES team has worked with the LCL team to come up with the right capacity to be installed considering the cement plant's existing energy mix which comprises gas generators in combined cycle, Kiln waste heat recovery and Grid.

Successful completion of Installation supervision & commissioning of Siemens Gamesa Wind Turbines 410 MW

12 May 2023

The importance of wind energy and renewable sector in Pakistan cannot be overstated, the development of Wind Sector can help address the country’s energy crisis, reduce dependency on imported energy and mitigate the impacts of climate change.

OES wind team played a vital role in executing the WTG installation supervision, commissioning, and testing work on 205 wind turbines (410 MW) with high excellence in quality & zero harm safety. Team has also received multiple appreciations and awards from SGRE and the Investors of WPPS for its exceptional services and true demonstration of profession.

OES higher management awarded a shield of appreciation and certifications to OES wind team, in recognition of diligent efforts exhibited by them for successful completion of Installation supervision & commissioning of Siemens Gamesa Wind Turbines 410 MW in Jhimpir wind corridor Sindh, Pakistan.

This is the first time that a local company has been awarded such a job by a foreign Wind Turbine manufacturer and hopefully this will open up international wind market for these services for OES and other local companies associated with this segment.

Procurement of J1 X JMS 616 J101 2678 ekW by Soorty Enterprises

5 May 2023

As businesses grow and expand, we often rely on partnerships and collaborations to achieve our goals. Prime model of a successful business relationship is OES partnership with Soorty Enterprises Pvt. Ltd. Its a great example of how two companies can come together to create something that is greater than the sum of its parts.

Soorty Enterprises has recently ordered 1 X JMS 616 J101 2678 ekW for their Spinning Unit at Landhi, Karachi. By leveraging each other's strengths and expertise, OES and Soorty have been able to create innovative products and achieve service excellence since 2005 when we sold first unit of JGS 320.

The proud partnership between OES and INNIO Group is a shining example of what can be achieved when two organization work together towards a common mission i.e. to provide consistent Gas Power Generation and after sales support to the best of our abilities. Total 21 units of INNIO Jenbacher Gas Generator sets are running with 33 MW of power generation capacity.

Descon Engineering procured Cummins DG Sets

20 April 2023

Primarily being an engineering firm, we understand the importance of our industry. It plays an important role in infrastructure development, agricultural productivity, environmental sustainability, cooperation with academia, social and ethical role and to mitigate the energy crisis etc. Utilisation of indigenous resources and provide services to the best of our abilities is our core objective. Descon Engineering is one of OES valuable industry partner and an exclusive customer, Descon is Pakistan’s leading Engineering enterprise with a wealth of expertise in various sectors, their global presence spans the GCC, (including Kingdom of Saudi Arabia, UAE, Kuwait, Qatar, Oman), Iraq, Pakistan and South Africa.

OES tries to connect with the target audience below the surface level, it enables us to understand their requirements, resolve their problems and create a sense of mutual understanding. Descon trusts the top-notch products of Cummins Inc. coupled with reliable and consistent service excellence of OES. Recently Descon procured 02 x 50 kVA, 02 x 100kVA & 02 x 250kVA DG Sets as a standby source of power from OES for various projects in North Region.

Steam Turbine Project for Queen South Textile Mills Limited, Bangladesh

14 April 2023

We are proud to announce that Queen South Textile Mills Ltd, Bangladesh, has shown its trust in our team in Bangladesh for the Supply, Installation, and Commissioning of Extraction Condensing Steam Turbine with BOP equipment.

Our Extraction Condensing Steam Turbine is manufactured by HCTC, a leading manufacturer of steam turbines. This steam turbine has a capacity of 4MW without extraction and 2MW with extraction. Our extraction-condensing steam turbine will generate electricity and provide the option of extracting the steam from the turbine that can be utilized in plant utilities. This makes our solution cost-effective and environmentally friendly as it maximizes resource use and minimizes waste.

In addition to the turbine itself, our package includes a water-cooled condenser, oil device, generator air cooler, cooling tower and cooling tower pumps, along with their installation and commissioning. We understand that electrical equipment is equally important, so we are providing a DCS control system, MV and LV switchgear, Sync Panel and an Auxiliary transformer to complete the package. We know that every detail counts regarding your equipment's efficient and safe operation. That's why we include all the critical accessories required for the turbine startup, ensuring that our solution is practical and easy to use.

With this latest project win, we continue expanding our footprint outside Pakistan and are excited to make our mark in the global energy sector. Our success is measured by the success of our clients, and we are committed to delivering unparalleled service and support to ensure that our clients are always ahead of the curve.

Industrial Visit - The Hunar Foundation

07 April 2023

Industrial visits provide students the opportunity to interact with Industry Experts: give them a chance to meet industry leaders, professionals, entrepreneurs, policymakers, and corporates who share their wisdom, learning and experiences.

On March 28th, 2023. an industrial visit was organized for The Hunar Foundation students. Hunar Foundation is a non-profit organization based in Pakistan that aims to provide vocational training to underprivileged youth in the country.

When pursuing a professional degree in the field on electrical and mechanical, OES industrial visit has its own importance for students because only the theoretical knowledge is not sufficient for their proper understanding of the actual business operations at the ground level.

The visit was curated by OES to provide students a detailed explanation of technical department and their role in the company along with safety hazard and HSE policy. Students were taken to the workshop floor, where they were exposed to practical work related to generators, engines, alternators etc.

Cummins Distribution Award

27 Mar 2023

Cummins Marine Command and Control System with Insite training

17 Mar 2023

Technical trainings enable us to use equipment the way Cummins intends them to — to the fullest, recurrently and seamlessly. Our prime goal is that we are all able to operate equipment in a way that promotes smooth operation and bring value to clients that helps them fulfil their power generation needs.

OES in collaboration with Cummins arranged 1 week Cummins Marine Command and Control System with Insite training for OES and customers’ staff. Training was designed to develop staff not only on theoretical grounds but they were given an opportunity to visit multiple sites for hands on experience and a full day was dedicated to answer FAQs.

Technical training equips OES and customer staff to handle GenSets in an efficient and most effective way which ultimately helps us build brand image and reliability on OES products. A special mention of Cummins Technical Expert & Marine Application Engineer for his visit and departing his valuable knowledge for the development of our service team.

Sea Water Reverse Osmosis Plant at Arabian Textile Mills Ltd

10 Mar 2023

OES appreciates the work culture and core values of Arabian Textile Mills Ltd. we believe in strict quality measures and supports the idea to promote Pakistani products in international market. OES takes utmost pride in maintaining Arabian Textile Mills Ltd. as its valued and prestigious client.

Previously Arabian Textile Mills Ltd has procured Gensets and chillers from OES, considering the professional work ethics and technical skill sets of OES team they chose OES to setup RO plant at their premises. We managed to supply, install and perform testing & commissioning of complete Sea Water Reverse Osmosis Plant successfully with (Sea Water RO 200,000 Imperial Gallons per Day on feed TDS of up to 12,000ppm).

Reverse osmosis is a separation technique in which pressure applied to a solution forces the solvent through a semipermeable membrane from a region of low concentration to one of high concentration, leaving behind the solutes. The membrane allows passage of small solution components, such as fresh water, while preventing passage of larger molecules, like salts and other impurities. The overall recovery of the water is about 62%. The water has been utilised in process, dying and utility purposes by the company.

OES FZCO - Dubai Municipality Sewage Treatment Plant - 6MW

03 Mar 2023

Veolia, a renowned Global Water Treatment group provided a turnkey solution to Dubai Municipality Sewage Treatment Plant for their waste to Energy project with the installation of 4 X Innio Jenbacher JGC 420 Sewage gas engines with total installed capacity of 6 MW.

OES has provided complete solution including supply of gensets, installation supervision, testing and commissioning. The power from gensets will be used for Sewage plant load demand and surplus power can be exported to local grid.

During the Sewage Treatment Process, this particular plant produce sewage gas of 2600 Nm3/hr. as a byproduct of the process, which is flared in the atmosphere. The typical composition of Sewage gas is 50% Methane, 40% CO2 and other volatile gases. Innio Jenbacher biogas engines are specially designed to burn this gas efficiently and with the recovery of engine heat from hot water & exhaust overall plant efficiency reaches more than 85%.

Worldwide Innio Jenbacher biogas engines operating successfully and generating more than 325 MW.

Cummins Power Generation Seminar

27 Feb 2023

In OES we promote customer – centric culture, the interactions customers have with our company at all stages of the customer journey are consistently solicitous.

To give our team a leading edge, OES arranged a seminar in South and North regions to honor Mr. Mohamed Danoun, Territory Manager – AME from Cummins Power Generation on his maiden visit to Pakistan. More than 53 customers and consultants were invited along with staff in this seminar from different business ventures.

OES provided a platform to its customer and principal to interact with each and get to know more about the dynamic product range of Cummins Power Generation. The seminar was followed by a Q&A session moderated to by OES senior team members.

INNIO Distribution Award - MyPlant Usage and Engagement

10 Feb 2023

Overhauled 624H Gen-set (4MW) in Lahore workshop - Fazal Group

03 Feb 2023

Fazal Group Multan being one of the top textile mills of Pakistan currently operating with 18 different Gen-sets and a total of 42 MW, is OES prestigious client in North Region. For OES, longevity with client is not enough, we believe in achieving milestones of services with our clientele. We focus on building relationships to last for years, our clients have a mission, and that mission becomes ours by extension.

OES relationship with Fazal Group started in the year 2006 and in the last 17 years OES has managed to prove its loyalty be delivering best products and achieving service excellence. OES sold multiple gas genset to Fazal Group in the year 2006 and continued to provide various products and services from our portfolio ranging from Diesel Generators, HVAC, Pumps, Solar Power etc.

Recently OES overhauled their 624H Gen-set (4MW) in Lahore workshop and commissioned it successfully at site. During this process Mr. Jørgen Brodersen joined us from INNIO Group Jenbacher.

Mesia Solar Award 2023 - Power Cement Project

31 Jan 2023

Burj Capital, 7 MW Power Cement Limited Solar project has been nominated for the award of the solar project, in the category of best C&I (commercial and industrial) projects based outside of the Middle East by Mesia Ventures.

Burj's team highlighted the uniqueness and challenges of the largest on-site solar PPA, the first hybrid plant in Pakistan, and recognized the efforts of all the partners and their team members to turn this dream into a reality.

Supply and construction of 5MW and 2MW ground-mounted solar system projects were awarded to OES by Burj Capital in the year 2022 for Power Cement. The location, structure, resources, activities, and other project variables made this project different from other solar projects. This is the largest PPA installation in Pakistan, It is the first hybrid wind-solar PPA plant in Pakistan. One-year wind data collection is in process.

Defying all odds OES managed to install solar plants at Power Cement located at Nooriabad within 6 months.

Solar Energy commits to balancing Power Cement electricity consumption from the grid by off-taking an environment-friendly energy source. This project shall produce 200GWh and offset up to 112,000 tons of CO2.

Distributorship Signing Ceremony (Chicago Pneumatic - Atlas Copco Group)

20 Jan 2023

We are pleased to inform that OES has signed an agreement as an exclusive distributor of Chicago Pneumatic - Atlas Copco Group representing complete range of Screw Air Compressor from 4 kW to 355 kW.

OES arranged the signing ceremony at OES Head Office where respected Chief Guest Mr. Sohail Shahzad – General Manager of Atlas Copco Pakistan was invited. The agreement was signed by Mr. Nasim Ahmed – CEO (OES) and Mr. Sohail Shahzad – GM (ACP).

Atlas Copco Group acquired Chicago Pneumatic in 2001, one of the markets leaders of USA. Since 1901, Chicago Pneumatic has delivered reliability with a deep understanding of customer needs. They are a global manufacturer of high-performance power tools, air compressors, generators, light towers and hydraulic equipment for professional and industrial applications. These products are engineered for performance and lasting customer value and stay committed to offering innovative, reliable products and services, based on technology and trust since 120 years of passion for performance. The efficiency and life of Chicago Pneumatic (“CP”) Air Compressors is much better than competition resulting in savings of electricity and ultimately the operating cost.

As an exclusive distributor of Chicago Pneumatic, OES now offers all range of air compressors suitable for high temperature zones and special environment in Pakistan. OES offers a wide selection of high-quality air compressor packages in attractive prices, complete after sales, services with spare parts delivery around-the-clock.

Artistic Fabric Mills Pvt. Ltd procured J-Type Shuangliang Steam Operated Absorption Chillers

13 Jan 2023

OES being a major supplier of Absorption Chillers in Pakistan, has managed to supply 400 Nos. Absorption Chillers in industries such as energy, oil and gas, textile, hospitals, pharmaceuticals, food etc. with complete turnkey solution.

OES relationship with Artistic Fabric Mills Pvt. Ltd. has been nurtured in a way that always results in positive outcomes for both organisations. OES takes utmost pride in maintaining Artistic Fabric Mills Pvt. Ltd. as its valued and prestigious client.

Recently Artistic Fabric Mills Pvt. Ltd. procured from OES 02 Nos. J-Type high efficiency Shuangliang Steam Operated Absorption Chillers possessing a cooling capacity of 400 USRT. Shuangliang Steam Operated Absorption Chillers uses heat instead of electricity, which is highly recommended for areas with electricity shortage. It is a more environmentally friendly and economical product as it uses the heat energy source from the surrounding thermal power plant as a heat source. The COP (coefficient of performance) offered by Shuangliang Steam Fired chiller is 1.55 which is highest in the prevailing market.

Aga Khan University Hospital procured Cummins DG Set

30 Dec 2022

Cummins Inc. a global power technology leader combined with OES reliable services in power generation industry, makes the dynamic duo the best choice for our customers. Recently one of the most prestigious institute, Aga Khan University Hospital procured 1 x C350D5B – 320 kVA Prime Cummins Diesel Gen Set from OES.

Aga khan focuses on providing the best health care services in Pakistan, as well as the learning hub for its students, currently operates in multiple cities, Aga Khan Maternal & Child care centre in Hyderabad procured Cummins Diesel Gen Set 1xC350D5B as their stand by power source.

OES strong business relationship with Aga Khan university hospital translates into referrals, testimonials, and creates an authentic and meaningful bond between both parties.

1MW Solar System installed at Prosperity Weaving Mills Limited

28 Dec 2022

As the cost of using solar to produce electricity goes down each year, OES offers its clientele various solar energy solutions. Recently one of Pakistan’s prestigious groups, Nagina Group, moved towards the initiative of solar energy as it is sustainable, renewable, and plentiful.

Nagina Group has installed 1MW Solar System at its weaving production company “Prosperity Weaving Mills Limited”. This system has achieved 1400 MWh of clean energy for 1st year with reduction of 3200 tons of carbon dioxide.

Solar power helps our client save money in the long run and going solar is a wise investment on individual level, one wise decision is big progress towards saving our planet!

20th Contractors' Senior Management HSE Workshop - Eni Pakistan

23 Dec 2022

In order to strengthen OES continual engagement with customers, we attended one of the most prestigious communication initiatives of the year, Contractors’ Senior Management HSE Workshop conducted by Eni Pakistan HSE on 14th December, 2022 at Marriott Hotels Karachi.

OES made a pledge during the year 2021 workshop that this year OES will conduct at least 01 STOP Work Authority Mock Drill campaign and reports will be shared with ENI. As per signed HSE requirement, OES honoured ENI pledge and managed to conduct Stop Work Authority Mock Drills. With great pleasure, we would also like to share that OES has been selected for the best submitted report in the given category out of total 17 Contractor Companies.

During the workshop OES Jenbacher Service team received an appreciation shield from Mr Paolo Giraudi (MD ENI Pakistan Ltd.) for conducting the outstanding research and presentation.

-->

Industrial Partnership with DHA Suffa University

16 Dec 2022

OES believes in building partnerships with local universities, recently Department of Mechanical Engineering from DHA Suffa University, collaborated with us for technical projects and research initiatives.

OES Industrial visits provide students with an opportunity to learn practically through interaction, working methods and employment practices. The program covered areas such as OES milestones, its local and international market standing. Technical team also briefed on engine design, its maintenance, component understating and new advance engineering exposure including remote monitoring system (myplant).

OES team also visited the university to provide students exposure towards the current work conditions of any industry. Most advance features of INNIO Group- Jenbacher “my Plant” over view, my Plant online and mobile application, my Plant analytical approach and concept coupled with engine performance key factors were explained by OES technical team members.

Meeting emerging talent and perform research about real mechanical engineering and discuss energy issues also allows OES foster new aptitude. Dean Dr. Ahmed Hussain also appreciated OES for facilitating their students with advance case studies and experiences.

2 MWs solar power plant at Service Industries Limited

09 Dec 2022

OES takes pride in partnering up with Service Industries Limited to add up to their vision of sustainable renewable energy with a 2 MWs solar power plant. This system will produce 2400 MWh of clean energy per year with reduction of 4200 tons of carbon dioxide.

Service Industries Limited (SIL) is a public limited company listed on the stock having a turnover of about PKR 40 billion ($245 Million) and is the largest manufacturer of footwear, tyres and tubes.

Green energy is important for the environment as it replaces the negative effects of fossil fuels with more environmentally-friendly alternatives. OES has always pitched the idea to its clientele to move towards clean and green energy as OES renewable portfolio offers multiple services with all and every kind of solutions.

METRO (60MW) & GUL AHMED (50 MW) WIND POWER PROJECTS INAUGURATION CEREMONY

07 Dec 2022

OES participated in 60MW Metro Power Group & 50MW Gul Ahmed Electric inauguration ceremony on 30th November and received award on successful completion of Erection Supervision, Testing & Commissioning and electrical installation of substation at Metro & Gul-Ahmed Wind Power Projects.

The Honourable Federal Minister of Power and Energy Mr. Engineer Khurram Dastgir Khan, H.E. Ms. Sarah Mooney, Deputy Trade Commissioner and Director Trade at British International Investment (BII) and Mr. Danish Iqbal Alimohamed, Chairman of Metro & Gul-Ahmed Wind Project appreciated the services of OES for the completion of two projects.

OES Wind portfolio is diverse and we take pride in being the pioneer service provider in Pakistan’s Wind industry. OES has been providing services to an installed base of 460 MW of Wind Power, our team has always managed to deliver to the best of their abilities and has made OES a market leader in renewable energy segment.

Supply, installation, testing & commissioning of Cummins Power Generators at Mobilink Jazz (Lahore)

02 Dec 2022

OES has completed another supply, installation, testing, commissioning project of brand new Diesel Engine driven Cummins Power Generation. 500kVA generator in Lahore at one of our extremely prestigious telco customer Mobilink Jazz.

Regardless of the power system architecture required to meet your market or application needs Cummins Inc. provides a superior combination of solution design expertise and integrated equipments to help you maintain a resilient operation at your site.

After successfully completing previous projects of Cummins Power Generation 1500kVA x 06 (nationwide) to same customer, it is of great pleasure to serve them again as their trust on our product and services has helped us establish long-term relationships.

OES engineering and sales teams have collaborated on this project to manage deliverables effectively and efficiently.

Overhauling of Dunham Bush vertical screw compressor- capacity 283 (TONS)

18 Nov 2022

OES workshop is fully equipped to perform overhauling, maintenance and rebuilt activities with our proficient and expert team members. Recently OES has managed to successfully perform overhauling of Dunham Bush MSC2246BHL6V5KOEMU4C-C vertical screw compressor- capacity 283 (TONS) in our Karachi workshop.

Our vision has always been to facilitate our client and Kohinoor Textile as our prestigious client entrusted OES to provide best solutions and ensure equipment runs smoothly through all production quarters.

The average downtime incident often costs companies a fortunes, we always suggest our clients to invest in preventative maintenance to keep their industrial plant, functional and profitable. With the right monitoring and maintenance routines we are able to reduce downtime, maintain their operations’ peak performance and keep customers’ revenues flowing.

EPC Project of 132kV Power Cable Laying and CSE Termination Work at DHA IV Grid Station

11 Nov 2022

OES is proud to have contributed towards the energy demands of Karachi City. We have managed to complete EPC project including the laying of 132kV XLPE power cable and outdoor cable sealing end termination work at DHA IV Grid Station’s premises which will help K-Electric enhance their power distribution network. OES has supplied 132kV 630sqmm XLPE power cable & termination accessories from our principal manufacturer M/s. TBEA.

OES FZCO connected 2 X JGC 416 to Ajman Municipality Sewage Treatment Plant

04 Nov 2022

OES FZCO in collaboration with BESIX managed to provide 2 X JGC 416 to Ajman Municipality, Sewage Treatment Plant (Ajman – UAE). Total Power output is 2.4 MW, where our most skilled and equipped team successfully connected the sets to grid which ultimately led to exporting power to grid.

BESIX is a construction group, currently one of the world's leading international contractors, their trust in OES services and capabilities of our team to meet deadlines efficiently has paved new paths for future alliances and projects.

On-Site HSE Training

31 Oct 2022

In order to develop a positive health & safety culture, where safe & healthy working becomes second nature to everyone OES arranged an On-site HSE training for its workforce. Employee training in health and safety is needed to educate employees on the workplace’s various hazards and how to manage them. Training covered how to identify workplace hazards, address and avoid them. A key benefit of health and safety training program is reducing the number of incidents in the workplace.

1MWp Solar Power System at Main Nazir Industries

25 Oct 2022

1MWp Solar Power System at Main Nazir Industries

CUMMINS Generators 2 X C1400D5 (1250kVA Prime rating) at Faysal House

21 Oct 2022

Faysal House Building, Head Office currently operating on Jenbacher Gas Engine previously installed and commissioned by OES, decided to choose OES for the procurement and installation of CUMMINS Generators 2 X C1400D5 (1250kVA Prime rating). Cummins Diesel Gen Sets will be installed with remote radiators and to be synchronised along with existing Gas Generator at roof top of Faysal House.

CUMMINS being a market leader in Diesel Power Generation world, coupled with OES outstanding sales and after-market services makes this dynamic duo the best choice in power generation industry.

A special mention of our consultant ElekEn Associates for providing timely support and guidance throughout the project.

Pak Water & Energy Expo - OES participation

19 Oct 2022

OES participated in Pak Water & Energy Expo held at Karachi Expo Center from 4th October to 6th October 2022. The exhibition provides excellent opportunities to all users of water as energy to keep themselves abreast of the latest advancements in their particular field.

OES Water Division offers variety of services and products including but not limited to Brackish and Sea Water Reverse Osmosis Plants, Recycling Plant, Waste Water Treatment Plant, DI Plant, Water Softening Plant, Side Stream Filtration, Imported Filtration Media, Membranes and Filters, Chemicals etc.

Visitors benefit from a unique opportunity to connect with leaders from within and outside the water sector and to network with multiple 100 companies and various delegates.

Focusing on leading practice, innovation and solutions, the exhibition provides new networking and business opportunities and ensures maximum exposure between OES and attendees.

Shuangliang Absorption Chiller - Saya Weaving Mills

30 Sep 2022

Saya Weaving Mills, one of our valued clients and end-user of Jenbacher gas generators, currently operating on 5.5 MW gas operated power plant, were seeking an avenue to recover the jacket water heat from their plant. OES pitched the idea of installing a hot water absorption chiller which ultimately provide cooling to their humidification plant of weaving sheds.

Saya Weaving Mills is currently in process of installing 01 No Shuangliang two stage hot water operated absorption chiller model HSB-1157H2 of net cooling capacity of 759 RT on the combine header of 01 x JMS-616 + 01 x JGS-420 B311 + 01 x JGS-420 B05 at 90% load.

Two stage hot water operated absorption chiller is a patent design of Shuangliang . OES has managed to supply and install more than 85 chillers of this type in textile sector of Pakistan, making us the number one choice in the local industry for absorption chiller.

Scope of the project involved design, supply & installation supervision work. A special thanks to M.M.G Engineering for being the Co-generation Consultant for this project.

Success Story: 3.5 MW Ground Mounted Solar System at Diamond International Corporation Limited

19 Sep 2022

3.5 MW Ground Mounted Solar System at Diamond International Corporation Limited.

Supply, testing and inspections of CPG

02 Sep 2022

PAEC General Hospital, DG Khan required a backup / emergency power source and trusted OES to provide the best resource and services to seal the deal. OES DGS team managed to supply CPG 1 x C550 D5 (500kVA Prime Rating) & 1 x C330 D5B (300kVA Prime Rating) to M/s Fazal Malik & Co. (FMC) in May 2022.

OES believe in building relationships with customers solely on the grounds of trust and honesty, with the intent of providing optimum solutions. OES team managed to provide a test run for both gensets at KHI warehouse, gensets were tested and inspected in the presence of CEO FMC, Chief Engineer and Executive Engineer of PAEC General Hospital, DG Khan.

After successful testing and inspection gensets were transported to site with complete satisfaction of the customer and end user.

Full scope of MEP in collaboration with MIA and Pak Gulf Construction

26 Aug 2022

Full scope of MEP in collaboration with MIA and Pak Gulf Construction

Spotlight Award - Ingersoll Rand

19 Aug 2022

Spotlight Award - Ingersoll Rand

Success Story: Supply 08 Mobile Cranes of 30 and 55-tons capacity to FWO.

12 Aug 2022

Frontier Works Organisation was raised in 1966 for the construction of Korakoram Highway and is considered as one of the largest firm in Pakistan today specialised in multifarious fields of civil engineering.

FWO and OES remains committed to their motto of sustaining excellence with integrity, sincerity and takes pride in cultivating the culture of quality work. OES is proud to announce that we have concluded a deal of supply 08 Mobile Cranes of 30 and 55-tons capacity to FWO who is the biggest buyer of construction equipments in Pakistan.

It is pertinent to mention here that this is the first time OES has succeeded in selling equipments to FWO and we expect to continue to collaborate with the prestigious organisation in the near future as well. OES and FWO are committed to uplift the national interest by providing service excellence to its clients.

Success Story: Waukesha product upgrades

05 Aug 2022

United Energy Pakistan, is a subsidiary of a Chinese United Energy Group in Pakistan with footprints in Sindh.

They currently possess and operate on approx: 100 Waukesha Gas Engines in Pakistan and the most crucial jobs such as overhauling, troubleshooting and upgrades are performed by OES.

It gives us immense pleasure to announce the achievement of OES for its efforts towards Waukesha product upgrades, recently a successful completion of the 2XESM2 upgrade of 12V 275GL+ Enginators had taken place.

OES scope was to supply, install and perform testing & commissioning of complete system. The job was completed within the stipulated time frame without any failure and Enginators are running efficiently.

Success Story: OES Reverse Osmosis Plant at Yunus Textile Mills Limited (UNIT-07)

29 Jul 2022

OES managed to set up Sea Water Reverse Osmosis Plant at Yunus Textile Mills Limited (UNIT-07), Landhi Industrial area successfully with (Sea Water RO 200,000 Gallons per Day).

OES RO plants uses a considerable amount of water pressure, making it the most effective water purification technique in the market. OES Industrial Reverse Osmosis Plants are carefully customized and configured to suit the individual requirement of the output water, which varies from normal drinking application to the specific usage, such as food processing, pharmaceuticals and boiler feeding requirement.

OES scope included supply, installation, testing & commissioning of complete system. The RO is designed on raw water having TDS (Total Dissolved Solids) up to 10,000ppm, overall recovery from Reverse Osmosis Plants is about 75% which reflects the efficiency of OES magnificent team and its complete system. The water is being utilized in multiple utility purposes by Yunus Textile Mills Limited.

Water Reverse Osmosis Plant at Yunus Textile Mills Limited (UNIT-09, Kathore)

01 Jul 2022

OES has successfully set up Brackish Water Reverse Osmosis Plant at Yunus Textile Mills Limited (UNIT-09, Kathore), efficaciously with (Brackish Water RO 80,000 Gallons per Day). Reverse osmosis is one of the most fascinating, evolved forms of water filtration technology and the benefits of reverse osmosis have made it a popular choice among many industries for filtering the water.

OES RO plants uses a considerable amount of water pressure, making it the most effective water purification technique in the market. OES Industrial Reverse Osmosis Plants are carefully customized and configured to suit the individual requirement of the output water, which varies from normal drinking application to the specific usage, such as food processing, pharmaceuticals and boiler feeding requirement.

OES scope was to supply, installation, testing & commissioning of complete system. The RO is designed on raw water having TDS (Total Dissolved solids) up to 5,000ppm, overall recovery from Reverse Osmosis Plants is about 70% which reflects the efficiency of OES magnificent team and its complete system. The water is being utilized in multiple utility purposes by Yunus Textile Mills Limited.

27th INTERNATIONAL HVACR EXPO & CONFERENCE

23 Jun 2022

OES and our dynamic principals including Shuangliang, Dunham Bush, Euroclima, Mesan and Erensan participated in the 27th International HVACR Expo & Conference organized by the Pakistan HVACR Society at Expo Centre Lahore. OES powered the event as a Gold Sponsor.

Variety of advanced HVACR Equipment were displayed in the event; by 200+ National and International exhibitors. The 3 days conference on the theme of “Emerging Trends in HVACR” covered the latest trends involved in the HVACR industry like Energy Efficient Buildings Design, Net Zero Energy Building, Green Design & Sustainability, Potential of Alternative Energy and Cooling resources, Emerging Technologies in VRF System, New Refrigerants and Cold Chain Refrigeration industry with leading HVACR experts panel discussions.

Expo empowered HVACR professionals, clients and consultants to:
• display their company profile and business potential
• provide a platform to build professional relationship by brainstorming future business prospects, issues related to multiple industries
• work towards shared business goals and interest.

Overhaul and Maintenance of 15 MW Steam Turbine for Lucky Cement, Karachi

17 Jun 2022

Lucky Cement Limited, Karachi hired expertise of OES to overhaul their 15MW HCTC Waste Heat Recovery Steam Turbine installed at their cement facility. Steam Turbine was installed in 2009-2010 and completed 80,000 plus running hours. For overhaul LCL choose OES to carry out the work keeping in consideration Company’s past expertise in maintenance, repair and overhaul of Steam turbine.

OES team successfully completed overhauling of steam turbine which improved the capability of steam turbine to generate 12.5 MW, earlier the turbine was not able to run beyond 4.5MW load. This successful commissioning adds another milestone in OES service sector profile.

OES scope of services included, but not limited to, as follows:
• Rotor Sand Blasting
• Rotor journal grinding, polishing and balancing
• NDT Testing
• Grinding, White metaling and polishing of turbine bearing

OES team completed the job without OEM presence and successful commissioning was done within the stipulated time frame without any failure and turbine started running successfully.

Successful completion of turbine overhaul has opened up new avenues for OES and customers are relying on OES for a reliable solution for steam turbine maintenance and overhauls in absence of OEMs personnel thus reducing the cost of overhaul services.

Dealer Excellence 2022 winner

16 Jun 2022

An award is a symbol of success! OES, became a Dealer Excellence 2022 winner, awarded by STAMFORD I AvK.

Success Story: Recognition by SGRE at Metro Wind Project

10 Jun 2022

We are pleased to announce that our valued employee Mr. Adnan Ali received an EHS star of the month award for his hard work and dedication to promote HSE culture at site from SGRE. Mr. Adnan has helped his team to adopt safe working behavior at site to strengthened the overall safety culture.

At Metro Wind Power Project, our HSE member conducted multiple trainings such as electrical hazard, first aid and its precaution measures etc. also managed to complete WTG commissioning inspection and emergency preparedness and response inspection on Sphera Cloud.

Overhauling and recommissioned Jenbacher Gas engine at Ellcot Spinning Mills Pvt Ltd

03 Jun 2022

Ellcot Spinning Mills (Nagina Group) is one of OES most prestigious client, located in Raiwind Lahore, they have been operating on our 2 x 4MW JMS-624H Jenbacher Gas engines.

OES workshop and services team recently overhauled 1 x 624 engine after successful performing 30,000 hours in Lahore, after the successful overhauling, our team also managed to re-commissioned the engine at site using state of the art recommended tools and followed the complete protocols related to re-commissioning.

OES services and workshop team members are known for their professionalism, technical skills and knowledge in power generation industry and their experience in the respective fields make them truly creditable of their hard work.

INNIO Team members also participated this task where Mr. Alexander and Mr. Nadir joined our local team.

Data Analytics Course by ICAP

27 May 2022

Data allows organisation to evaluate and assess their responsibilities better. OES understands the inevitable need to learn advanced tools and techniques to comprehend, analyse and present data to facilitate stake holders make dynamic decisions.

Digital Accounting and Assurance Board (DAAB) of Institute of Chartered Accountants of Pakistan (ICAP) for Chartered Accountants, organised a data analytics course in collaboration with Saylani Mass IT Training (SMIT) program.

The objective of this course was to equip professional accountants with data analytics skills to overcome any challenge they face while playing key role in this rapidly changing world.

OES, being a progressive organisation, fully acknowledge the emerging importance of data. Our Head of Finance participated in this course and successfully completed all three modules.

Cummins Diesel Generators procured by Pakitex Boards Pvt Ltd.

20 May 2022

Pakitex Boards Pvt Ltd, makers of well- known brand ‘PATEX’ are pioneers of engineered wood solutions in Pakistan. Due to gas load shedding and scarce gas resources, the need for back-up power becomes inevitable, customer was seeking a cost effective and power-efficient back-up solution for Korangi Plant and Port Qasim Plant.

CUMMINS being a market leader in Diesel Power Generation world, coupled with OES outstanding sales and after-market services makes this dynamic duo the best choice of industry.

Pakitex Board procured 2 x C1400 D5 (2 x 1250 kVA) Cummins Power Generation Diesel Generating Sets.

Official Distributor - Liebherr

13 May 2022

We are pleased to announce that OES is now an official distributor of world renowned Liebherr Earthmoving Equipment, including bulldozers, wheel loaders, excavators, pipe-layers, excavators and dump trucks etc. for Pakistan.

Liebherr Appliances is one of the top ten manufacturer in the world having manufacturing plants in Germany, France, Austria, China, Brazil and Russia.

OES also offers Liebherr mobile cranes, level luffing cranes and concrete machines. With OES outstanding sales and after sales services we are optimistic to become a market leader in no time.

Social Dialogue Session - World day for safety and health at work

29 Apr 2022

To spread awareness about World Day for safety and health at work, OES arranged multiple interactive sessions in OES HO and various sites, In OES, we promote the prevention of occupational accidents and diseases at all times. During social dialogue sessions, HSE team emphasised on healthy discussions at work place that enhances overall productivity of individuals and also the significance of mental and physical health, where safe & healthy working becomes second nature to everyone.

They also briefed about a safe and healthy workplace not only protects workers from injury and illness, it can also lower injury/illness costs, reduce absenteeism and turnover, increase productivity and quality, and raise employee morale. In other words, safety is good for business.

World day for safety and health

28 Apr 2022

World day for safety and health

EARTH DAY

22 Apr 2022

EARTH DAY

Success Story: COD-DIN Energy Ltd, Liberty 1 Wind Power & Lakeside Energy Ltd

22 Apr 2022

It gives us immense pleasure to announce an achievement of OES for its efforts towards sustainable growth of clean and green energy in Pakistan, through operation of three more 50 MW wind power plant in the Jhimpir wind corridor, namely, DIN Energy Ltd, Liberty 1 Wind Power & Lakeside Energy Ltd has recently achieved COD.

DIN, Liberty1 and Lakeside are other three successfully completed WPPs of OES, those are completely operational now. Earlier, OES’s SGRE Framework team had completed COD of two projects of 50MW each namely, Master Green and Lucky (Tricom) Wind Power Plant. With the addition of 3 more projects, OES Framework team has delivered a cumulative capacity of 250MW of green energy to the national grid.

At these projects, OES has provided services of pre quality inspections of WTG equipment, erection of WTGs as per SGRE quality protocols, mechanical completion inspections , energization, testing and commissioning of Wind turbines as prescribed in the EPA including RRT while maintaining highest degree of HSE compliance.

To acknowledge diligent efforts exhibited by OES Team during the installation and energization of DIN wind farm, they awarded OES with a shield of appreciation, during the post-COD celebrations organized by the investors at project site.

OES and Innio Training Collaboration

12 Apr 2022

OES believes in regularly providing the training to its team members (employees, customers and principals), our tailored and individualized training approach, ensures everyone who trains with OES unlock his true potential and gain the most out of each session.

OES successfully arranged an INNIO Qualification training session at its Head Office Karachi in the month of March, FTA (Field Tech Advance Training) was planned to enhance INNIO field Staff technical capabilities, which paves the way for our engineers to qualify for the second module INNIO – Jenbacher Commissioning Engineer Training.

Our esteemed and renowned trainer Mr. Ijaz Abid was invited from Dubai to conduct the sessions, his profound technical knowledge and years of experience has made him an Authorized Trainer of INNIO.

Supply and Installation of 8.42MW solar power system - YTM

06 Apr 2022

OES has signed an agreement with Yunus Textile Mills Limited for the supply and installation of 8.42MW solar power system. The systems will be installed at three different units of YTM located in Karachi and Nooriabad. The signing ceremony was held at YTM Unit-1 where Mr. Nasim Ahmed (Director – OES) and Mr. Hassan Tabba (Executive Director – YTM) signed the contract in a dynamic session. This Project is another step towards making us a distinguished market leader and reliable solution provider.

Denair Distributionship

05 Apr 2022

Orient Energy System (Pvt.) Ltd. is now an authorized distributor of DENAIR Energy Saving Technology (Shanghai) PLC., who are one of the top leading exporting Chinese manufacturing brand, promoting Sino German joint venturing based Technology air compressors all over the world.

The efficiency and life of DENAIR Energy Saving Technology (Shanghai) PLC. is much better than many prevailing brands resulting in saving of electricity and ultimately the operating cost.

Success Story: Award of contract 7MW Solar Power Project- Power Cement & Burj Capital

01 Apr 2022

Award of contract 7MW Solar Power Project- Power Cement & Burj Capital

RAK Ghani Glass WAUKESHA GAS ENGINE Major Overhauling

30 Mar 2022

Rak Ghani Glass LLc UAE is one of the most prestigious end user of Orient FZCO, possessing three Waukesha Gas Engines L5794LTD Extender Engines of 900KW each, operating in Ras AL Khaimah, UAE. OES scope included supply of Waukesha parts and services. All three engines have successfully completed 60,000 running hours. OES recently performed major overhauling of these engines along with load tested engine and handed over to client for normal operation.

OES is known for its dynamic and extremely competent service team and we take extreme pride in our service excellence. Professionalism, patience, and a “people-first” attitude is the foundation of our skilled service team.

Success Story - Energization & Award Ceremony of 50MW Wind Power Project

25 Mar 2022

OES has achieved another milestone by successfully completing the Wind Power Projects namely “DIN Energy Limited and Gul Ahmed Electric” OES awarded its team Excellence in Performance Award in recognition of their efforts and great team work on such fast-track projects.

OES scope included complete electrical works including installation, erection, testing & commissioning of EboP (Electrical Balance of Plant) Equipment.

OES diligent team members are working at multiple remote Wind Projects nationwide to provide the best services and ensure to contribute in the development and growth of not just OES but of the whole nation at large.

Success Story - 50 MW LIBERTY-II & 60 MW METRO Wind Power

18 Mar 2022

OES team have successfully completed wind turbine installation supervision of another two wind Projects namely 50 MW LIBERTY-II Wind Power and 60 MW METRO Wind Power at Jhimpir, Sindh.

The aforementioned projects are also part of larger portfolio of wind projects for which OES is rendering its services to Siemens Gamesa (SGRE). This mega portfolio includes 08 Wind Projects of cumulative capacity of 410 MW, out of which installation supervision has completed on 07 Wind Projects in record time by OES wind energy team. OES scope included the equipment quality checks at reception, supervision of WTG installation, erection activity, post installation quality inspections for electro-mechanical completion & testing commissioning works of SGRE wind turbines.

The said projects have been completed while maintaining the SGRE guidelines, Zero Harm Policy and HSE compliance. OES Wind team is known to be one of the most qualified, efficient and trained in the Wind Power Sector.

Success Story- CPG

11 Mar 2022

Diamond International Corporation Limited (DICL), is one of the subsidiaries of M/s N.P. Group of Industries and was established in 1978, mill located at Hub Industrial Estate and Head Office in Karachi.

DICL, procured 3 x C550D5e (3 x 500kVA Prime rating) CUMMINS Power Generation Diesel Generating Sets from OES. Ours sales team has always been extremely persistent with their efforts and their prompt response for queries and time-based deliverables are their most distinguished features.

Services We Render in Wind Sector

04 Mar 2022

With internationally certified resources, OES holds world standards capabilities in designing of wind and hybrid farms in Pakistan. OES also cover all phases of EPC from designing, procurement, construction, testing and commissioning along with the operation and maintenance of Wind Farms.

Our track record of projects includes complete onshore EPC of Zephyr and Lucky Renewable Energy (Formerly Tricom) 50MW each Wind Power Plant, executed successfully with prime quality & high compliance to HSE.

OES also holds expertise in safe and efficient installation and commissioning of wind turbines. It has recently completed installation of 200MW of wind projects in Jhimpir Wind Corridor. The larger portfolio of wind projects for installation, testing and commissioning includes 8 Wind Project of cumulative capacity of 410 MW.

OES being an internationally certified operator extends its high quality and industrial standard services in Operations and Maintenance of Wind Farm for ensuring high yields and efficiency throughout farm’s life cycle, while maintaining international management system standards of Wind Farms.

OES Achievement in Operation & Maintenance of wind projects

25 Feb 2022

OES is internationally certified for operation & maintenance activities of Wind Projects in the field of operational quality, environment, health & safety. Presently, OES has successfully completed 02 years warranty period O&M of Zephyr 50MW project ensuring high yield & availability throughout the tenure.

OES has started Operation & Maintenance (e-BOP) of Lucky Renewable Energy 50 MW Wind Project. Moreover, we have also signed off the Long-Term Operation & Maintenance (e-BOP) Contracts of seven (07) projects of 50 MW each as consortium with SGRE.

OES has been audited & accredited by Bureau Veritas back in 2019 for international certification of wind farm full scope operation & maintenance.

At present, OES is engaged in Operation & Maintenance of 410 MW of Wind Projects.

Overhauling of 73 Cummins Diesel Gen-Sets

04 Feb 2022

OES outstanding customer service has played a pivotal role in making OES the market leader. Our loyal and regular clients are a prime example of efforts our team has put in by being available 24/7 to cater to their needs.

OES has achieved a milestone by overhauling 73 Diesel Gen-Sets, highest number of engine overhaul in the year 2021. The remarkable team work of OES after sales, parts, workshop and technical support has helped OES achieve this goal, with zero redo jobs.

Our dedicated team is manifesting to unlock an unprecedented target in the year 2022, by covering major ratings of Diesel Generators in Pakistan Territory.

Installation supervision and commissioning of SGRE wind turbines by OES team

28 Jan 2022

Orient Energy System (Pvt.) Ltd, has successfully completed the installation supervision of wind turbines at two 50MW Wind Projects namely DIN and Liberty-I wind power plant at Jhimpir, Sindh.

The aforementioned projects are part of larger portfolio of wind projects for which OES is rendering its services to SGRE. This mega portfolio includes 8 Wind Projects of cumulative capacity of 410 MW. Out of which 4 projects have been completed in record time by OES wind energy team. OES scope included the QC inspections of equipment, technical supervision of WTG installation & testing commissioning works of SGRE wind turbines.

The said projects has been completed while maintaining the SGRE protocols, Zero Harm Policy and HSE compliance. OES Wind team is known to be one of the most efficient and trained in the Wind Power Sector.

Recognition and Appreciation - Fire and Security By SFFECO

25 Jan 2022

Orient Energy Systems (Pvt.) Ltd has always maintained its integrity by exceeding the targets set by the principals. During the International Fire and Security exhibition at Dubai, our Fire and Security Division was presented with a shield by SFFECO owner and chairman Mr. Hadi Alkhateeb.

Orient has contributed to the industry by providing best solutions according to international standards enabling major exporters to fulfil all the stringent compliance requirements of buyers. We are confident to keep the growth at the same phenomenal rate in the forthcoming years.

Brackish Water Reverse Osmosis Plant at Union Fabrics (Pvt.) Ltd. SITE Industrial Area.

14 Jan 2022

Reverse osmosis is one of the most fascinating, evolved forms of water filtration technology and the benefits of reverse osmosis have made it a popular choice among many industries for filtering the water. OES managed to set up Brackish Water Reverse Osmosis Plant at Union Fabrics Pvt. Ltd, SITE industrial area successfully with (Reject Water RO 68,000 Gallons per Day).

OES RO plants uses a considerable amount of water pressure, making it the most effective water purification technique in the market. OES Industrial Reverse Osmosis Plants are carefully customized and configured to suit the individual requirement of the output water, which varies from normal drinking application to the specific usage, such as food processing, pharmaceuticals and boiler feeding requirement.

OES scope was to supply, installation, testing & commissioning of complete system. The RO is designed on reject water having TDS (Total Dissolved solids) up to 12,000ppm, overall recovery from Reverse Osmosis Plants is about 60% which reflects the efficiency of OES magnificent team and its complete system. The water is being utilized in dyeing, boiler and multiple utility purposes by Union Fabrics (Pvt.) Ltd.

8.8 MW (02 x JMS624@11kV) FAST TRACK JENBACHER PROJECT

07 Jan 2022

OES was awarded a project to supply and provide installation & commissioning of 8.8 MW, Jenbacher 02 x JMS 624 @ 11kV gas generator sets at Liberty Mills Limited, Nooriabad through competitive bidding.

This was a fast track project where OES trained and skilled team members brought another feather to OES cap by completing this project only within a span of 2 months, which indeed is a remarkable achievement in the power generation industry.

Our scope involved engineering and installation of Exhaust System, Fuel Gas System, Cooling Water System, Lube Oil System, Ventilation System, Control Panels, MCC Panels, Cable Tray Network, Earth interconnection system, Laying and termination of MV & LV Power and Control cables, MV & LV Cables Testing (Hipot & Megger) and Commissioning of Gas Generator sets.



Associated with Mekotex Textile Mills Limited for more than 2 decades

24 Dec 2021

A successful organization knows the value of its customers, OES is known to give supreme importance to its customers and has always tried its best to meet all their demands. It is a great privilege of OES to be associated with Mekotex Textile Mills Limited for more than 2 decades.

Mekotex Textile Mills Limited is one of the leading manufacturer and exporter of Denim and other cotton fabrics in Pakistan. OES and Mekotex shares the primary objective of great values has always endeavoured to stand out in the market, be innovative with their products and services.

To choose reliable source of power generation, Mekotex Textile Mills Limited Kotri decided to procure latest technology and fuel-efficient gas engine Long Block from OES. Proficient technical evaluation and accurate financial feasibility provided by OES team with extraordinary commitment to customer has made OES a number 1 choice in the field of power generation.

The technical support of INNIO Jenbacher to improve the quality of INNIO Product has given OES an edge on excellence and OES has always reassured long term success for Mekotex Textile Mills in terms of power generation.

Complete supply and installation of 2 x 620J Engine Long Block has been provided by OES.

Concrete Batching Plant For Road Project Near Multan Under CPEC

15 Dec 2021

Concrete Batching Plant For Road Project Near Multan Under CPEC

MoU Write-up Sungrow

07 Dec 2021

OES being a prolific contributor and one of the few initiators in promoting green energy in Pakistan, proudly announces its collaboration with Sungrow. Sungrow is one of the largest manufacturers of PV Inverters and storage systems in the world.

On 1st December 2021, OES and Sungrow signed 25MW MoU for supplying on-grid Solar Inverters for renewable energy projects in Pakistan. OES and Sungrow shares this proud moment by signing the MoU at the Annual SUNGROW Pakistan Power Day Seminar 2021 held in Karachi.

OES believes in building partnerships with organizations known for pushing the agenda of renewable energy and sustainable world”.

OES organizes a Simulated Fire Drill

03 Dec 2021

OES organizes a Simulated Fire Drill for the safety of its people bi-annually, the purpose of a fire drill is to familiarize and re enforce proper evacuation routes and practices. The goal is to have the proper actions be an automatic response whenever fire alarms sound, so that everyone safely evacuates the area in an orderly manner.

The more familiar staff are with fire drill procedures, the higher the chance that staff remain safe and well during an emergency.

Also, OES have the capability to provide services to our client in firefighting, first aid, HSE implementation at client premises and its project site.

Recognition of Continuous Collaboration

26 Nov 2021

To enhance the business in Telecom/Data Centre Infrastructure sector of Pakistan, Cummins Power Generation and OES arranged an Online Session for “Recognition of Continuous Collaboration” and latest Product Introduction for one of our valuable client and Telecom/Data Centre Infrastructure provider in Pakistan CNS Engineering.

In the event, Cummins Power Generation experts presented latest development in the Telecom/Data Centre related products. They also presented the capability of Cummins to work in Telecom/Data Centre with the collaboration of OES in Pakistan from application to engineered design for complex Designing/Installation. They also highlighted some of the largest International Data Centre references projects in which Cummins Power Generation provided solutions.

OES Director Sales Mr. Zafar Iqbal along with DGM North Sales Mr. Shafaat Ahmad and associated sales team participated in the Session at customer premises other OES Sales Staff join the session from OES North and South sections. Cummins Directors Mr. Dany S Adam & Mr. Anirudh Singhania specially participated, acknowledged the Customer’s Trust on Cummins Product & OES.

From CPG Valerie Hyde (Territory Manager) and Deeshon Munshi (Business Manager – Datacenter, Telecom & New Technologies) lead the session. CNS Engineering senior management along with President & CEO were the part of session, Cummins Technical and Commercial Team participated virtually from UK and UAE.

HVACR Distributors and Manufacturers Convention 2021

26 Nov 2021

OES participated in the first ever Distributor and Manufacturers Convention organized by the Pakistan HVACR Society on 20th November, 2021 at Ramada Hotel.

This first ever convention was organized by Pakistan HVACR Society with the help of leading HVACR organization of Pakistan. OES being one of the market leaders sponsored this event as a Platinum sponsors with the contribution of Shuangliang and Dunham Bush.

We presented our company profile along with a brief description of our product line. At the end of the convention, OES was awarded with a shield of participation by the Chief Guest Mr. Yunus Khan (Former Captain – Pakistan Cricket Team).

Our management team was provided with an opportunity to gather with the leading consultants in the market and built professional relationships with them. OES HVACR, Pumps plus Fire & Security Divisions represented us in this convention.

EBOP Installation, Testing & Commissioning of 50MW Wind Power Project

19 Nov 2021

OES scope involved erection, installation, testing and commissioning of 02x31.5/40/50MVA Power Transformer with nitrogen fire protection system.

Our team was responsible for providing AIS, Reactive Power Compensation Equipment, AIS Installation, Metering System, MV Switch gears, Aux. Transformer, Earthing Transformer, Neutral Grounding Resistor, Switch gears, Battery Banks, Control & Protection System, Telecom & Scada System, Underground MV Cable Laying and termination, LV & Control Cable Laying and termination, Building Electrification and also CCTV and Fire Alarm system installation.

OES sea and brackish water reverse osmosis plant at Al Abbas Fabrics Pvt. Ltd.

12 Nov 2021

‘OES sea and brackish water reverse osmosis plant at Al Abbas Fabrics Pvt. Ltd., is one of the most significant osmosis plants in SITE industrial area of Karachi.

OES Scope involves supply, installation, testing & commissioning of complete system. The project is installed on bore water TDS of 15,000ppm in which its reject whose TDS is around 25,000ppm is also recovered about 45%. Overall recovery from reverse osmosis plants is about 80%. The water is being utilized in dyeing, boiler and various utility purposes.

Capacity of OES plant: Brackish Water RO 300,000 Gallons Per Day and Sea Water RO 100,000 Gallons per Day. OES trained and talented team has commissioned the project this year with complete turnkey solution to its valuable customer.’

2 Nos. Alfa Laval Waste Heat Recovery Boilers in Iraq at Al-Shamook Lucky Investment Limited.

15 Oct 2021

OES - Engineering team has supplied 2 Nos. Alfa Laval Waste Heat Recovery Boilers in Iraq at Al-Shamook Lucky Investment Limited. The cement plant is located in Samawah, Iraq.

OES scope involved; supply, installation supervision and commissioning of the complete project.

Steam produced from boilers is used in the cement manufacturing process through waste heat recovery project. The technical knowledge and attention to detail of OES Engineering team has made them well-grounded and a trusted name in Power Generation Industry.

25th Anniversary

05 Oct 2021

OES 25th Anniversary, A Message From Senior Management

Shuangliang High COP Steam Operated Absorption Chillers at Gatron Industries Ltd.

24 Sep 2021

Gatron Industries Ltd. with its manufacturing facility located in the city of Hub, Baluchistan, on the outskirts of Karachi procured chillers from OES for their polyester manufacturing facility.

OES team managed to install 03 Nos. Shuangliang High COP Steam Operated Absorption Chillers of 450 RT cooling capacity each. After successful performance of the product and prompt OES after sale services, they replaced all existing 12 Nos. chillers with Shuangliang Steam Operated Absorption Chillers.

Gatron availed the opportunity to save the operating cost of steam by installing Shuangliang High C.O.P Steam fired chillers. They replaced all the Existing Steam Fired chillers with Shuangliang Steam fired chillers.

INNIO Jenbacher Gas Engine3 Series Efficiency Upgrade for fuel saving

17 Sep 2021

INNIO Jenbacher Gas Engine3 Series Efficiency Upgrade for fuel saving.

Tricom Wind Power Plant (Lucky Group) 50MW

10 Sep 2021

OES has achieved another landmark by successfully completing the Installation, Testing & Commissioning with the Reliability Run Test leading the 50MW Tricom Wind Power Plant (Lucky Group) to be fully operational and commercially operated on August 31, 2021 and since then efficaciously exporting the electricity to the national grid.

OES being the authorized distributor of Valvoline Lubricants in Pakistan

27 Aug 2021

OES being the authorized distributor of Valvoline Lubricants in Pakistan is proud to be associated with Healthcare Sector of Pakistan. By delivering high end solution through Valvoline Engine Oils, OES has managed to help its customers to improve equipment reliability along with commercial viability.

Pakistan’s leading hospitals including Aga Khan Hospital, Liaquat National Hospital, National Institute of Cardiovascular Diseases (NICVD), Tabba Heart, SIUT, Memon Medical Institute Hospital, Shifa International Hospital, Dr. Ziauddin Hospital, South City Hospital are OES satisfied customers using Valvoline Lubricants for their power generation needs.

With Valvoline High end products and OES efficient and trained team, Health Sector has managed higher engine protection and significant decrease in engine downtime.

Jenbacher Gas Engine JMS 616 J101 at Lucky Textile Mills

06 Aug 2021

To choose reliable source of power generation, Lucky Textile Mills Limited decided to procure latest technology and fuel efficient gas engine from OES. Proficient technical evaluation and accurate fincnacial feasibility provided by OES team, reassured long term success for Lucky Textile Mills in terms of power generation.

OES got turnkey project for complete package with supply & installation of Jenbacher Gas Engine JMS 616 J101 – 2680 kW. Its electrical efficiency is 44.7% with better heat recovery.

Grundfos Pumps For Style Textile

30 Jul 2021

OES is proud to be associated with number 1 exporter of Pakistan, Style Textile known for apparel manufacturer, operating out of Lahore, Pakistan. OES team supplied Grundos Pumps for the expansion of existing unit as well as for their new plant located at Manga Raiwand Road.

Our scope consists of turn-key solution for the complete bore hole including accessories and GRUNDFOS submersible pumps- 3 sets for existing unit and 2 sets for new project, we also supplied the pumps for RO plants, evaporator cooling pumps, drinking water pumps, boiler feed pump and HVAC pumps for their new unit.

Cummins Diesel Gensets at China Mobile Telecom Company

16 Jul 2021

Cummins Diesel Gensets installed for providing back-up power at China Mobile Telecom Company

Fire Hydrant and Sprinkler system at Yunus Textile Mills

13 Jul 2021

Fire Hydrant and Sprinkler system at Yunus Textile Mills

Signed a contract with HydroChina International Engineering Company Ltd

12 Jul 2021

OES has signed a contract with HydroChina International Engineering Company Ltd. for Installation, Testing & Commissioning of eBOP Equipment of 2 x 50 MW Wind Power Projects of DIN Energy & Gul Ahmed in Jhimpir, Thatta.

Scope includes erection, testing & commissioning of 132 kV switchyard, AIS, 33 KV MV system, MV Panels, LV & DC system, etc. This brings the total to 4 x jobs with similar scope, including the previous 2 projects of Tricom 50 MW & ZPL 50 MW Wind Farm.

OES team offers a wide range of services in the Transmission & Distribution of power including Installation, Testing, Commissioning & Energisation of EHV UG/OH Transmission lines, Transformers, Switchgears (GIS/ AIS), Grid Station & Sub Station. Some Specialised services including Electrical Network studies,
Thermography of electrical systems, O&M contracts of GS/ SS, Earthing & Grounding works and other Retrofit activities.

Signing ceremony with Star Denim in Karachi

02 Jul 2021

OES and Star Denim are actively working together for the Go Green initiative. To support the cause, we have been chosen to provide photovoltaic panels on Star Denim Pre-Engineered Building (PEB) shed for their Industrial Zone Facility. This photovoltaic system will protect the environment by reducing 207 Metric ton carbon dioxide annually.

This is OES 11th successful project of PEB Shed, which increased the sales and customer service capacity along with customer trust in OES Renewable Energy.

Won INNIO Jenbacher Award for Algorithm Based Engine Pre-Alert

“Success Story”

To prevent severe engine damage and to curtail high cost of engine repair OES and INNIO Jenbacher Introduced an Algorithm on ‘MyPlant’ to provide pre-alerts to user to protect engines.

Our very own PSD Technical Support team not only designed the algorithm but also initiated the pilot program to drive pre-alert for predictive maintenance and proactive service of Jenbacher gas engines to avoid any unexpected component failure due to lack of operation vigilance.

Only after a year of this triumphant accomplishment of algorithm in Pakistan, INNIO implemented this OES-recommended algorithm globally to drive pre-alert for predictive maintenance and proactive service of Jenbacher gas engines.

Achieving this milestone, PSD added another feather in its cap and made OES proud globally.

Labour Day 2021

01 May 2021

OES celebrating the hard work and undying efforts of labors today, tomorrow and always!

Cricket Tournament 2021

06 Mar 2021

OES passionately promotes a culture of inclusion and firmly believes in the idea of motivating every individual working for the organisation. To continue the legacy of being a great employer, OES arranged its 8th Super League for everyone working in the system. The league represents unity, pride and team spirit!

We congratulate OES Lions - ORM Bulls – South and OES Sultans - OES Zalmi - North for bearing the winner and runners-up title, respectively!

Mou signing ceremony with Master Changan Motors in Karachi

11 Mar 2021

Our Solar Division has signed a 2.5 MW Solar Project with Master Changan Motors in Karachi. The agreement was signed by the Director of Changan Motors Mr. Samir Malik and the Group Chairman of Orient Energy Systems Mr. Muhammad Saeed. Project will be installed at Master Changan Motors' Bin Qasim plant on Pre-Engineered Building (PEB) and will generate approximately 3.485 GW annually.

This brings total OES renewable portfolio to 110+ projects bearing 130MW+ capacity and counting! This will be OES 10th Project on PEB shed. Being the pioneer in implementing Solar panel on PEB shed, OES carries special expertise in it. OES Renewable team comprises of 150+ dedicated engineers having in house design, Project Management and QA/QC capabilities to deliver all projects professionally and efficiently.

International Women's Day

10 Mar 2021

We choose to challenge all kinds of gender stereotypes at workplace.

Wind Turbine Genset (SGRE) 410 MW project

9 Mar 2021

Our Wind Division is pleased to announce it’s collaboration with Siemens Gamesa Renewable Energy (SGRE) for installation supervision and testing/commissioning of 410 MW of Wind Turbine Gensets.

Our team has been fully trained for GWO, BST, BTT and SGTT to perform their duties professionally at multiple sites. OES has become one of the only few Pakistani companies to have achieved such great level of expertise in the field of Wind Power.

Kudos to our Wind and Engineering Team!

Sinjar Cement Factory Northern Iraq 50 MW Project

22 Feb 2021

Sinjar Cement Factory located in Northern Iraq is a 50 MW project based on MAN HFO generators with auxiliaries. OES provided major retrofit by making the engine and electrical side functional, the plant successfully started dispatching power from mid January 2021 and expected to be completed by April 2021. OES also was able to supply complete waste heat recovery boilers and purification systems within the given time limit.

Happy Chinese New Year 2021

12 Feb 2021

Happy Chinese New Year 2021

Get in touch

Get answers to your questions about products, sales, support or any other query.

Call us on

(+92) 111-507-507

Email us

info@orient-power.com

Awesome Image

OES Family

  • Orient Oils
  • Orient Rental Modaraba

Links

  • Home
  • QHSE
  • Contact Us
  • Request a Quote
  • Careers
  • Feedback
  • Download Flyer

Services

  • Engineering
  • Product Support Services
  • Product Support Parts
Orient Energy Systems (PVT) Ltd.
  • Home
  • About Us
  • What We Do

    • Diesel Gensets & Diesel Engines
      • Cummins Engine Business Unit (EBU)
      • Cummins Power Generation (CPG)
    • Construction Machines & Material Handling
      • Machines & Cranes
      • Forklift Trucks - Hangcha
      • Road Maintenance Trucks
    • Pumps
      • Grundfos
      • Viking Pump
      • Pump Works
    • Fire & Security
      • Security – Miscellaneous
      • Fire – Miscellaneous
    • Gas Gensets
      • Innio Jenbacher
      • Innio Waukesha
    • Wind Power
      • Gamesa Renewable Energy
    • Compressors
      • Ingersoll Rand
    • Lube Oil
      • Valvoline Gas Engine Oil
      • Valvoline Diesel Engine Oil
    • HVACR
      • Absorption Chillers – Shuangliang
      • Electric Chillers and AHUs – DB
      • Cooling towers – Mesan
      • Boiler – Erensan
    • Solar Power
      • EPC Solar Solution
      • Grid Tied Solar
      • Submersible Solar Pumps
    • HFO/Dual Fuel
      • Hyundai
    • Transmission and Distribution
      • EPC Transmission & Distribution
    • Coal Power
      • EPC Coal Power Solution
    • Nitrogen Oxygen Generators
      • INMATEC - Germany
  • Services

    • Engineering
    • Product Support Services
    • Product Support Parts
  • Projects
  • Media

2019 © All Rights Reserved
Orient Energy Systems Pakistan (Pvt.) Ltd.