OES and Goldwind have joined forces in a commitment to assist Pakistan’s industries in adopting green practices and achieving Net Zero goals.
We are delighted to announce that OES and GW have signed framework agreement to supply 150 MW of wind turbines for the Pakistan’s Industrial Captive market, marking a significant milestone in our commitment to sustainable energy solutions.
Out of this 150 MW, 50 MW + is already in production in Goldwind factories and site construction has started. OES is offering complete one window solution which includes wind resource assessment, feasibility study, detailed engineering, supply of wind turbine from Goldwind, civil constructional works, wind turbine installation, testing and commissioning under Goldwind supervision along with electrical & control integration with existing system through a state of the art Micro Grid system to have different generation sources work together, provide smooth operation of the plant and optimization to get lower LCOE.
GOLDWIND is world’s largest wind turbine manufacturer in the world with a globalpopulation of 115 GW+ with a market leadership position in Pakistan with 538 MW in IPP and Captive Market. OES as local company has the biggest portfolio of renewable energy (Solar+ Wind), having inhouse capability of complete design, engineering, project management, construction, testing and commissioning, backed by OES trade mark after sales services!