EBOP Installation, Testing & Commissioning of 50MW Wind Power Project

OES scope involved erection, installation, testing and commissioning of 02×31.5/40/50MVA Power Transformer with nitrogen fire protection system.
Our team was responsible for providing AIS, Reactive Power Compensation Equipment, AIS Installation, Metering System, MV Switch gears, Aux. Transformer, Earthing Transformer, Neutral Grounding Resistor, Switch gears, Battery Banks, Control & Protection System, Telecom & Scada System, Underground MV Cable Laying and termination, LV & Control Cable Laying and termination, Building Electrification and also CCTV and Fire Alarm system installation.